Loading…
Loading…
14,501 results • Best match
Providing new bore well with Motor and Pipe line Arrangement in Puthirai Vannan community in Anuppapattti Panchayat under UGF 25-26
Erection of SUBMERSIBLE pumps in borewell labour charges for erection of twin packer duplex tube jet pumps in borewells up to 150mm dia including fixing of suction pipe regulating valves with jet assembly up to a maximum depth of 30m
De-silting of inflow channel and Intake well located near Wardha river for water supply to residential Colony of Neeljay Sub Area of Wani Area.
De-silting the Supply Well, Intake Well/ Head Works, Sump of water supply / sewerage works etc. in wet or dry condition including lifts upto 9 M and lead upto 150 M as required beyond the work site, stacking, spreading, including necessary guarding, etc. complete, as directed by Engineer -in - charge.
Custom Bid for Services - Supply, Installation & Commissioning of Centralized Alkaline RO Water Purifier System with Pipelining at Academic building IIIT, Nagpur including 1 Year Comprehensive Maintenance Contract (CMC) Period Similar Category Piping ... FOR WATER PURIFICATION ... Of Water Supply ... Water Supply Systems ... Rural Water Supply ... Water Supply Systems
Nagpur including 1 Year Comprehensive Maintenance Contract (CMC) Period Similar Category Piping Erection Service ANNUAL MAINTENANCE SERVICES FOR WATER PURIFICATION AND CONDITIONING SYSTEM (Version 2) Operation And Maintenance Of Water Supply Systems System Integration Service to Implement IoT Sensor- Based Measurement and Monitoring of Rural Water Supply Systems
Repair of borewell
Replacement of column pipe
AS PER BOQ AND TENDER DOCUMENTS
Notes : i. The contractor has to rectify all minor complaints on same day/major complaints within 2 days, otherwise a penalty of Rs. 1000/Hr of water supply interrupted incase of Engr-In-Charge is not satisfied with delay reasons. ii. Contractor has to arrangement temporary availability of water supply by connection with hose pipe, collar,etc upto rectification of water supply lines without extra cost. iii, The contractor should keep spares in hand for attending emergency complaints.