Loading…
Loading…
14,881 results • Best match
O and M Water Supply Schemes AMC 2026_27 CWSS to Kuthanur GPGeneral Civil Work
100.9.1:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 20 mm nominal outside diameter pipes.
CMC of the existing STP, WTP, RO Plant and Water Supply System (including consumables, spares etc.) for Bishnupur Super Speciality Hospital in the district of Bankura (2nd Call)
Comprehensive Operation & Maintenance (including all Consumables, Spares, Accessories) for the Water Treatment Plant including the Treated Water Supply System from underground reservoir to all overhead tanks at Bishnupur Super Speciality Hospital.
Operation and Maintenance of Water Supply Scheme Dhalanwas Tehsil and District Jhajjar including Water Works at Dhalanwas Tubewells, Installation pumping machinery, electric installation, street light, chlorination system and all other installation
Operation and Maintenance of Water Supply Scheme Dhalanwas Tehsil and District Jhajjar including Water Works at Dhalanwas Tubewells, Installation pumping machinery, electric installation, street light, chlorination system and all other installation including existing Distribution system and Rising Main for 36 months from the date of commencement excluding repair of civil structures and disinfectant (For the year 2024-25). (SDE No.2 Jhajjar Section-1). For the 1st year
Rectification Work for improving water quality in Thulasippara SLEC water supply scheme Under Package-1 of Nedumkandam GramaPanchayath in Idukki District
Desilting open wells of dia above 6.0m and up to 9.0m and depth up to 7.5m by earth work excavation in or under water, after closing the inlet valves and plugging any holes in the steining by engaging divers with breathing accessories, bailing out water using pump set of suitable capacity, lifting the excavated silt/mud/clay using ropes, pulleys and buckets and disposing the same within minimum lead of 50 m from the periphery of the well, including engaging coolies for scrapping the inner side of the well, without causing any damages to the existing structures and installations, including hire and conveyance of tools and plant and as per the directions of the department officers etc. complete.
Engaging 11 Nos of manpower for operation of Overhead tank for water supply distribution for 6 months at Madhuranthagam Municipality
Engaging 11 Nos of manpower for operation of Overhead tank for water supply distribution for 6 months at Madhuranthagam Municipality
As per BOQ
Supplying, laying, jointing & testing Ductile iron Pipes ,special class – K 7 ISI marked (IS-8329-2000 Reaffirmed -2005 Eddition 4.1) suitable for push on joints supplied with rubber gaskets , with sockets and cement mortar lining and metallic zinc coating inside and with finishing layer of bitumenous paint outside , without polyethelene sleeves but including Push on joint supplied with EDPM rubber gasket conforming to IS 5382-1985(reaffirmed-2003) with dual hardness of type 2 (bulb) and type-5 (Heel) quality , laid in trenches all as specified and as directed complete of following size:Note: After laying u/m pipe line the contractor should check proper water supply through the Pipe line.Note: (i) During laying pipe line cutting existing road/path/culvert/pcc tile and floor will be repair by the contractor without any extra cost and make surface as previous.