Loading…
Loading…
15,029 results • Best match
Construction of Farm Access Road at Lift Irrigation Scheme Jasoh,G.P Jasoh,village Jasoh,G.P. Badaran,Tehsil Nadaun ,District Hamirpur (H.P)
Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3wheeled road / vibratory roller 8-10 tonne capacity in stages to proper graded camber, applying and brooming requisite type of screening / binding material to fill up interstices of coarse aggregate, watering and compacting to the required density with in all leads and lifts complete to the satifaction of Engineer-in-charge
Custom Bid for Services - HEAT TREATMENT OF CARBON CARBON COMPOSITES Similar Category Service for Chemical Treatment of Cooling Water
Custom Bid for Services - HEAT TREATMENT OF CARBON CARBON COMPOSITES Similar Category Service for Chemical Treatment of Cooling Water
Irrigation
50.18.9.15.1:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 40 mm dia 10Kgf/cm2- External work- Exposed on wall
Repair & Water proofing Treatment of Expansion/Construction Joints at Academic block and Water proofing treatment at White House terrace area at NID Ahmedabad Campus
G.I. PIPE LINE LAYING WORK WARD NO 1,4,5,6,7,10,12,13,14 BIJAWAR
G.I. PIPE LINE LAYING WORK WARD NO 1,4,5,6,7,10,12,13,14 BIJAWAR
Emergent sludge cleaning of 1200 mm Dia MS raw water intake main in Mallick Bari Campus within Kamarhati Municipal area for smooth supply of raw water in PH-1 and PH-II treatment plant.
Dewatering by pumps including all leads, lifts and making all arrangements of disposal. where continuous flow of water from a source other than natural or ground water is encountered in case of emergency maintenance works related to leakage. breakage and making wet connections. [Note ;- In case of any other situation demanding such emergency dewatering. use of this item is to be approved by the Superintending Engineer/Tender Accepting Authority. This item shall be executed on the specific direction duly supported by proper clarification of the E.I.C. who will be satisfied in absolute discretion that such work has not been necessitated due to any natural source of water or any fault of the Contractor]