Loading…
Loading…
15,031 results • Best match
A/mtc of Water Supply Scheme in Sector-62, Faridabad. Providing and Laying of GI pipe, Providing and fixing of SFRC manhole cover and lowering and lifting of motor at Tubewell No. 6, Faridabad and all other works contingent thereto.
[20.99.Zone-V]Water Supply installation of shallow/Medium/Deep tubewells as per IS 2800:1991 Supplying and packing graded gravel in bore well of size as per ISI 4097, as amended up to date (Grade A, 2.25mm to 3.35mm) and specification attached with this schedule of item of work. The gravel should be free from dust, dirt or vegetable matters. Packing to be done from reducer to the bottom of liner all around in the bore with Margin above reducer in the housing pipe as per the requirement and will be packed after liner and housing pipes have been lowered and suitably clamped. Thickness and size of the gravel packing will be designed and directed by the Engineer-in-charge strictly as per relevant ISI. Zone-V. Gurugram, Nuh, Palwal, Faridabad, Rewari, Mahindergarh, Jhajjar
Drilling, Installation of New PVC T/Well Pumping Set House Connection for existing and new Pipe Line, Prov Laying jointing Testing PVC pipe for Distribution System, Replacement of Control Panel, Repair of Pump Chamber OHSR All other works Complete
Drilling Installation and commissioning of PVC T/well, Providing House Connection for existing pipe line & new Pipe Line Prov. & Laying jointing, Testing PVC pipe, specials for Distribution System, Sluice valve, Chamber, Chlorinator, Replacement of Control Panel, Repair of Pump Chamber, Repair of OHSR & Development of water works etc. & All other works Contigent there to Complete in all respect.
DPR Preparation for Construction of Lift Irrigation Scheme to lift water form Tunga River to feed Emmegundi kere, Mulurayyana katte kere, Basavana kere at Suguru Grama Panchayath, Shivamogga Rural Vidhana Sabha constituency, Shivamogga District.
Water Treatment Palnt me Chlorination System Ko badalne ka Kary
Replacing of Chlorination System/Accessories at Water Treatment Plant Unnao.
Dedicated Pipe laying for improvement of functionality for improvement of FHTC functionality by different dia. UPVC pipe,DI pipe and FHTC and Road crossing and augumentation of boundary wall for ALTOR Water Supply Scheme at Gazole Block of Malda Dis
Supplying, laying, fiting, fixing and jointing of UPVC pipes conforming to IS:4985-2000 with latest revision and amendments, if any, with necessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S. specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick payment without damaging the existing telephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as applicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good quality/approved brand solvent cement (as per IS:14182-1994 including cost of all fabricated PVC fitting i.e. tees,bend, reducers, adopter etc.as per IS:101-1988 and making flange joints including supplying required quantity of nuts, bolts and rubber insertion (CIDF sluice valves will be supplied by the department free of cost) as required at site by adopting suitable method so as to facilate the maintenance of pipe line locally as per conventional method including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining an average depth of cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C.
Additional laying of Pipe line for improvement of FHTC functionality by different dia UPVC pipe providing FHTC forSANKAIL piped Water Supply Scheme at Gazole Block in the District of Malda under Malda Division, P.H.E. Dte.
cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C. N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be produced before laying of pipe line. ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list. iii)No part payment at any stage on account of supply of materials shall be entertained. iv)Payment will be made on actual consumption of materials. v)UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list. vi)Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so. vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate of entire item. viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill. (A) Pressure Rating : Class - III (ii) Laying of pipe line including cost of pipe & fittings/specials but excluding cost of valves.