14,170 results • Best match
Sinking of Additional Source to resolve tail end pressure along with allied works like Interconnection and Laying distribution pipeline, Construction of Pump House, Construction of KHARBA Piped Water Supply Scheme at Chanchal-I Block of Malda Distric
cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C. N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be produced before laying of pipe line. ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list. iii)No part payment at any stage on account of supply of materials shall be entertained. iv)Payment will be made on actual consumption of materials. v)UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list. vi)Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so. vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate of entire item. viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill. (A) Pressure Rating : Class - III (ii) Laying of pipe line including cost of pipe & fittings/specials but excluding cost of valves.
Construction of well and piped water supply scheme at Mouje Shirsavane Dhangarwadi Tal. Mahad. Dist. Raigad
Item no11) Desilting the supply well,intake well/ head work ,sump of water supply etc in wet or dry condition including as required beyond the work site …etc com.
ANNUAL MAINTENANCE ESTIMATE FOR SEWERAGE SCHEME REWARI TOWN FOR THE YEAR 2026-2027 (SECTION-3 AND 4)
Providing and fixing Ductile iron double flanged non-rising spindle type manually gear operated Resilient Seated Sluice hydraulic valves as generally conforming to IS:5163, having body, wedge, bonnet etc. of graded Ductile iron to GGG-40, wedge fully encapsulated with EPDM rubber, inside screw non-rising type stainless steel AISI-420 spindle, valves suitable for a maximum working pressure of 16 kg/cm2 (seat test) and body tested to 21 kg/cm2. Flanges drilled to IS 1538 table 4 and 6. Inside and outside with liquid epoxy coating, thickness 250 micron, colour : RAL 5005 blue. Size- 150 MM, PN-1.6 Rating. IVC/VAG Make.
ANNUAL MAINTENANCE ESTIMATE FOR SEWERAGE SCHEME REWARI TOWN
Cleaning of Sewer lines by Bucket type sewer cleaning machine
Operation and Maintenance of 7 MLD STP
Jind A/Mtc. estimate for sewerage scheme Jind town Operation and Maintenance of 7 MLD SBR technology based STP and MPS (for Civil work, Electric Work, Mech. Installation Work, watch and ward and Horticulture work) Repair and consumable item etc, insurance charges, white washing for 1st and 3rd year at Old Hansi Road Jind town and all other works contingent thereto for 3 year complete in all respect.