Loading…
Loading…
14,172 results • Best match
Providing, laying, jointing, testing and commissioning of 63 & 75 mm dia HDPE PE-100, PN-6 1642mtr.& 80, 65 mm dia G.I. pipe 24 mtr.& providing connection in house hold and public instiutions-23 nos with valve specials and all fitting i/c all allied ... civil works complete ...
8524/E8 REPAIR/MAINT TO WATER SUPPLY INSTALLATION, SWIMMING POOL FILTRATION PLANT AND REPAIR OF LEAKAGE, CLEANING AND PAINTING OR CERTAIN OVER HEAD TANKS AND OTHER ALLIED WORKS AT SHAHJAHANPUR CANTT UNDER GE (EAST) BAREILLY
Supply and fix in replacement of 32 MM 3-layer PP-R Polypropylene random copolymer) concealed pipes SDR 7.4 (PN16) UVstabilized and antimicrobial fusionwelded havingthermal stability forhot & cold water supply includingall PP-R plain threaded polypropylene random fittings fixed complete to walls, ceilings or in floors etc.such as tee,socket ,albow,reducer etc for PPR Pipe water supply including all fitting and fixture reqd at site material as specified and directed by Enge -in-charge.
Construction and Necessary Balance works required for Retrofitting of Existing piped water supply schemes of Villages- KHUKARIYA Block- Berasia Distt.- BHOPAL
Construction and Necessary Balance works required for Retrofitting of Existing piped water supply schemes of Villages – KHUKARIYA Block – Berasia Distt.- BHOPAL based on Tubewells including installation of Electric submersible motor pumps, laying and jointing of Rising and Distribution pipe line system , House hold tap connections including cost of all material and labour with 90 Days successful Trial Run period of schemes. (BOQ As Per NIT)
Providing Water supply Arrangements Electrical Works EB Service Charges construction of RCC Compound Wall and RCC Culverts at Anaipalayam Burial Ground in Ward No 25
Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers Hard stiff clay, stiff black cotton, hard red earth, shales, murram gravel, stoney earth and earth mixed with small size boulders and hard gravelly soil.SS20B
Providing New Borewell Near Samiyarmadam at Kodangiapatty Panchayat
Labour charges for the erection of (Three PHASE 5.00 HP SUBMERSIBLE PUMPSET) submersible pumpset in borewell/openwell including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days.
Dismantling and reinstallation of Borewell at Utility 01
Charges for Fixing of existing motor along with existing pipeline of old borewell , Cable, etc. inculding connection of borewell with water tank main line incudling Gate valve, telemetry water meter etc.complete work in all aspects for the running of smooth borewell as per direction of engineer-in-charge. If any material required for the same except motor contractor will provide free of cost. No extra will be paid beyond quoted amount in this item