Loading…
Loading…
14,172 results • Best match
PETTY REPAIR/ MAINT OF EXTERNAL WATER SUPPLY FOR DGRE RDC MANALI AT AGE (I) R n D MANALI
M&L for bleaching powder for mixing the bleaching powder in water tank for water supply complete all as specified and as directed by Engineer-in-Charge.
Restoration of Water Supply Scheme Gulabpora, Shergarhi Chassana Kunderdhan and Singlikote of Block Chassana under SASCI
Dismantling G.I. pipes (external work) including excavation and refilling trenches after taking out the pipes, manually/by mechanical means including stacking of pipes within 50 meters lead as per direction of Engineer-in-charge : 50 mm dia G.I Pipes
Restoration of Water Supply Scheme Sarh Bagga Angralla and WSS Tukson of Block Mahore under SASCI
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:
Upgradation of water supply line at Sabarwal Gali Ustad Mohalla and adjoining area under JMC Capex.
Providing and fixing G.I. pipes complete with G.I. fittings excluding trenching and refilling etc. (external work) 40 mm dia. nominal bore
Improvement of water supply at Sarsari Line Bathindi Ward no 74 under JMC capex New Works.
Earth work in excavation by mannual means in trenches for foundations, drains, pipes cables etc. (not exceeding 1.5 mtrs in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including disposal excavated earth upto 1 Mt from cutting edge, disposal earth is to be levelled and neatly dressed in all kinds of soil.
Improvement of water supply at Green Valley Bermini Road Ward No 74 JMC capex New Works.
Earth work in excavation by mannual means in trenches for foundations, drains, pipes cables etc. (not exceeding 1.5 mtrs in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including disposal excavated earth upto 1 Mt from cutting edge, disposal earth is to be levelled and neatly dressed in all kinds of soil.