Loading…
Loading…
14,183 results • Best match
Operation and guarding of Boosting Pumping Station (BS-I) at AA-I under NTK Water Supply Project.
N.B.:- Work should be completed as per attached Terms & Conditions.
Supply Flood Precaution Materials and Engagging Oil Engine Motor For Dewatering of Water Logging Area Madhuranthagam Municipality
ORDINARY SOIL (SS20B) Earth work excavating and depositing on bank with initial lead of 10m & initial lift of 2m in Sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth (SS20B) Desilting channel/drain ,culvert. Manpower .Mazdoor Category - II
Improvement of Water supply at Arjun Vihar Gold Smith Lane No 9 under JMC Capex New works.
Earth work in excavation by mannual means in trenches for foundations, drains, pipes cables etc. (not exceeding 1.5 mtrs in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including disposal excavated earth upto 1 Mt from cutting edge, disposal earth is to be levelled and neatly dressed in all kinds of soil.
Permanent restoration/Re-construction of water supply scheme Hathal-A damaged due to flash flood under SASCI.
Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work. 40 mm dia. G.I. pipes.
Improvement of Water supply at nallah Azad Colony Bathindi Ward no 74 under JMC Capex New works.
Earth work in excavation by mannual means in trenches for foundations, drains, pipes cables etc. (not exceeding 1.5 mtrs in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including disposal excavated earth upto 1 Mt from cutting edge, disposal earth is to be levelled and neatly dressed in all kinds of soil.
Restoration of rain damages sewerage system Jawalamukhi Town
Providing Laying jointing and testing 150 mm dia PVC. Pipes 4.00 kg pressure high density poyvinile pipe conforming to IS 4984-1995 (PE 80 grade) Birla make fusion welding process i/c all necessary fitting and bends in all lead and lifts to the entire of the satisfaction of of Engineer-in-charge (earth work to be measured and paid seprately) with in all lead and lifts complete in all respect.