Loading…
Loading…
14,361 results • Best match
Repair of Pump Chamber OHSR Water Works and Pipe Line Leakages New Automated Water Controller Chlorinator Control Panel Water Connections Providing and Laying Pipe Line and Sluice Valve etc
Repair of Pump Chamber, OHSR, Water Works & Pipe Line Leakages, New Automated Water Controler, Chlorinator, Control Panel, Water Connections, Providing & Laying Pipe Line & Sluice Valve etc. at W/S Schemes Albelpura, Matoi, Kup Khurd & Jitwal Khurd Block Ahmedgarh District Malerkotla (Under 15th FC)
ROOF TREATMENT, REPAIR OF PLASTER, DOORS-WINDOWS BOUNDRY FENCING, WATER SUPPLY, SANITARY LIGHT FITTINGS AT SUKUWAN-DUKUWAN COLONY JHANSI AND RENOVATION OF OFFICE EUDSD-III AND OTHER ASSOCIATED CIVIL WORKS AT SIPRI DISTRICT-JHANSI.
Water proofing treatment over Roof, wall, Chajjas, Balcony etc. with Engineer Plus 7 layer waterproofing system at leakage, seepage area consisting of Surface preparation roughening of surface, opening of cracks in V groove in size of 5 mm to 10 mm width, Back filling of cracks with SBR Latex, 2 layer Spraying Mixture of Aquasil-99 and Aquaprime-99 (Take 20 liter clean water+ 1 liter Engineer Plus Aquasil-99 + 2 liter. Engineer Plus Aquaprime-99 in proportion 20:1:2 This solution should not sprayed over more than 40 sqm area, 3rd Laying 90GSM fiber glass mesh with proper overlap, 4th coat of brushable mortar prepared with Engineer Plus Aquaprime-99, water & cement (Aquaprime -99 @ 0.45 kg per sqm, water @0.45 kg per sqm & cement @0.68 kg per sqm.) in the proportion of 1:1:1.5 by weight, After 4th coat allow the coating to air cure for minimum four hours, after 4 hours interval apply, 2 coat of Flexicoat-99 mixed with Water (Flexicoat-99 @0.33 kg/sqm, water @0.66 Kg per Sqm) in the proportion of 1:2 by weight in 4 hours interval. After 6th coat allow the coating to air cure for minimum 4 hours. After 4 hours interval apply, 7th coat of Engineer Plus smartcoat-99 (Smartcoat-99 @ 0.45 Ltr/sqm & water @ 1.35Ltr/sqm in the proportion of 1:3). The surface will dry within 2 hours and surface would be fully water proof and usable after a period of 24 hours and the final appearance of the coating will be gray/milky white. The rates are included the cost of all chemicals, labours, and Required T&P for Proper completion of Work (NSI)
Facility Management Service- Manpower based (Version 2) - Industrial; Operation and maintenance of 200 KLD capacity Sewage Treatment Plant at Nigalpani, DGPS; Unskilled, DGPS; Semi-skilled, DGPS; Skilled, DGPS; Highly-Skilled
Facility Management Service- Manpower based (Version 2) - Industrial; Operation and maintenance of 200 KLD capacity Sewage Treatment Plant at Nigalpani
Annual maintenance of Sewage Treatment plant (0.7 MLD) at Central Prison Complex, Puzhal in Chennai city for the period from 01.07.2026 to 31.03.2027
Annual maintenance of sewage treatment plant of 0.7 capacity 24 hours per day by engaging qualified plant Operators in shift
Design, Drawing, Const. Testing and Comm. of S/S, 100 KLD Sewage Treatment Plant (STP) and 25 KLD Effluent Treatment Plant (ETP) for Subdivisional Hospital in Hinjilicut including Operation and Maint. for a period of Five Years
Construction of STP & ETP Designing, drawing, supplying, constructing, testing & commissioning of Effluent Treatment Plant (ETP) & Sewage Treatment Plant (STP) of required capacity and appropriate technology (MBBR / SBR / MBR) including all civil, electro-mechanical works, tertiary treatment system, automation etc all complete to achieve desired effluent quality as per NGT norms. (Excluding cost of SCADA system, PLC, plant room, chemical storage room, yard lighting, compound wall, external electrification, treated water storage sump and re-use/disposal arrangements) ETP- 25 KLD STP- 100 KLD
Cleaning of weeds from facultative Pond i/c grass and surface dressing work in the compound at Badwai Sewage Treatment Plant, Bhopal
Cleaning of weeds from facultative Pond i/c grass and surface dressing work in the compound at Badwai Sewage Treatment Plant, Bhopal