Loading…
Loading…
14,361 results • Best match
Providing and laying water supply pipe line to Salgame road left side, Vishweshwarayya badavane 1st and 2nd stage, royal appolo school adjecent roads, Dasarakoppalu 2nd stage and mavinahalli village in hassan CC Limits
Providing and laying water supply pipe line to Salgame road left side, Vishweshwarayya badavane 1st and 2nd stage, royal appolo school adjecent roads, Dasarakoppalu 2nd stage and mavinahalli village in hassan CC Limits
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Refit (SR-4) ICGS Vijit; HVAC, Firefighting system, Power House Equipment, Sewage Treatment plant, Electrical System or Installation, Pipelines, Power Generators, Refit ..
Sewage Treatment plant
Operations and Comprehensive Maintenance of the 110 (100plus10) MGD Bhagirathi Water Treatment Plant including Sangam Raw Water Pump House, Delhi for 5 years (Re-invite)
Variable component (1st year) : Cost of chemicals required for water treatment of rated output 110 MGD
Devli Strengthening of Existing water supply by laying of balance DI Pipe line and Replacement of old AC/PVC Pipeline and Drilling of 1 No. T/Well in village -Devli Distt Palwal.
Providing and fixing Float operated water gauge 6` wide 20` height painted and marked with in feet With bottom flange for fixing and pulley on top with 10` i/d copper ball with steel wire rope complete in all respect.
Custom Bid for Services - 200152684 OPERATION & MAINTENANCE OF SEWAGE TREATMENT PLANT OF 350 &750 KLD CAPACITY AND SWIMMING POOL FILTRATION UNIT AT NTPC-BONGAIGAON Similar Category Operation and Maintenance Power House/Power Plant
Custom Bid for Services - 200152684 OPERATION & MAINTENANCE OF SEWAGE TREATMENT PLANT OF 350 &750 KLD CAPACITY AND SWIMMING POOL FILTRATION UNIT AT NTPC-BONGAIGAON Similar Category Operation and Maintenance Power House/Power Plant
Additional laying of Pipe line for improvement of FHTC functionality by UPVC pipe line and Augmentation of PH-1,PH-2,PH-3,Earth filling and Boundary wall of PH-1,PH-2,PH-3 for BULBULCHANDI piped Water Supply Scheme at Habibpur Dev. Block in the Distr
N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be produced before laying of pipe line. ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list. iii) No part payment at any stage on account of supply of materials shall be entertained. iv) Payment will be made on actual consumption of materials. v) UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list. vi) Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so. vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate of entire item. viii) All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill. v)UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list. vi)Submission of completion drawing of pipe line showing all specials,valves, etc with final bill is mandatory.(Cost of drawing will be paid seperately). vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and deduction for such work will be made accordingly. viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill.