Loading…
Loading…
14,361 results • Best match
Engagement of security personnel for guarding arrangement at Bagjola Sewage Treatment Plant ,Kestopur to be executed by Central Mechanical Division under UDMA Department for the period of 01year.
Cost for engagement of guarding personnel for the round the clock guarding to protect all the premisses of Bagjola sewage Treatment Plant as per direction of the EICauthority.
providing and laying 350 mm RCC NP3 sewer pipe line and 100 mm DI water pipe line in Pocket C Sector-04, near Bal Bhawan, Ward No. 33, Division-2A, under MCG.
Making house connection of water supply damaged during excavation.
CONSTRUCTIONS OF PUMP HOUSE INCLUDING ALL PUMP FITTINGS, WALL FITTINGS ELECTRICAL FITTINGS, UPVC UNDERGROUND PIPELINE FOR PROVIDING LIFT IRRIGATION FACILITIES TO VILLAGE MACCHIWRA, IN DISTT LUDHIANA FROM SIRHIND CANAL RD 119450R.
Providing, Laying, fixing and jointing of PVC Pipes as per ISI 4985 (ISI marked with the prior approval of Engineer-in-Charge) along the Trenches and laying the same in Trenches to correct alignment and gradients, cutting, jointing and testing complete as per specification . 355 mm o/d pipe of 2.5 kgf./sqcm
CONSTRUCTIONS OF PUMP HOUSE INCLUDING ALL PUMP FITTINGS, WALL FITTINGS ELECTRICAL FITTINGS, UPVC UNDERGROUND PIPELINE FOR PROVIDING LIFT IRRIGATION FACILITIES TO VILLAGESEHJO MAJRA, IN DISTT LUDHIANA FROM SIRHIND CANAL RD 107335R
Providing, Laying, fixing and jointing of PVC Pipes as per ISI 4985 (ISI marked with the prior approval of Engineer-in-Charge) along the Trenches and laying the same in Trenches to correct alignment and gradients, cutting, jointing and testing complete as per specification . 315 mm o/d pipe of 2.5 kgf./sqcm
Laying of drinking water feeder pipe line and interconnection work for sky tower jhansi up
Dismantling of following types of roads including sorting out of servicable matarials stacking and disposal of unservicable materials with in a distance of 50 m. including supply of labour specials T&P etc. required for proper completion of work and road should be mortarable within 7 days after laying of pipe line.
Repair /renovation of LT and HT panel room, water proofing treatment for roof, rain water pipe fixing, plaster and Miscellaneous work at Sports Complex, University of Delhi
Repair /renovation of LT and HT panel room, water proofing treatment for roof, rain water pipe fixing, plaster and Miscellaneous work at Sports Complex, University of Delhi Note :- The Schedule Qty are attached with the tender document