Loading…
Loading…
16,047 results • Best match
Wadala Railway colony :- Need based repair on day to day basis for a period of 730 days
Deputing 06 staff for artisan staff for Masonry Man- work, Plumbing work,Carpentry work, welding, Days brazing of all work for repairs of taps& flush tanks,pipelines, replacement of broken window glass, repairs to door & window fittings etc as per ...
RENOVATION OF UTTARAN AREA PRIVIES AND BATHROOMS AT 61, RAJA NABA KRISHNA STREET, 9, ABHOY GHOSH LANE AND OTHERS UTTARAN AREA IN WARD NO-010, UNDER BR-II.
SECTION(B) - SANITARY AND DRAINAGE WORKS.(B)-(III) WATER CLOSETS AND URINALS.a) Original Works.(1)Supplying, fitting and fixing Shallow water closet Indian pattern (I.P.W.C.) of approved make in white vitreous chinaware in position (excluding cost of concrete for fixing).(i) 580 mm long
Construction work of Residential Building in Govt. PG College, Khatima (Udham Singh Nagar)
Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement... consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 ...
Annual and Special repair work of SWH, Nagura
Cleaning of sump/ borewell chamber including disposal of slurry/waste.
Disposal of Rain Water in various streets of Gandhi Colony in Ward No.27 in MC Sirsa (Re-Tender)
[22.218.2]Providing and Supplying of class SN 8 structured wall Polyethylene Piping system (Pipe with online/ offline coupler and elastomeric sealing ring) with non smooth external annular... annular corrugated and smooth internal surface (double wall) for non-pressure underground sewerage and drainage application as confirm to IS 16098 (part II):2013 including transportation, frieght charges, ...
REPAIR/MAINT OF GI/CI PIPELINE, VALVE PITS AND CONNECTED ITEMS AT AF STN SURATGARH
Continuous inspection of interrupted/breakdown of water supply and repair to make the continuity of water supply after detecting & rectifying the defect including cleaning blockage and replacement of fittings such as nipple, tee,union,socket etc in any pipe from 15mm pipe to size 25 mm in order to make good the continuity of water supply to the entire satisfaction of EIC.