Loading…
Loading…
14,805 results • Best match
IMPROVEMENT/ REPAIRS/ MAINTENANCE/OVERHAULING OF DG SETS AND ALLIED WORKS AND COMPREHENSIVE MAINT OF SEWAGE TREATMENT PLANT/SWIMMING POOL OF VARIOUS RATING ALONG WITH ACCESSORIES UNDER THE AOR OF GE DEOLALI
M&L for Fast Electrode maintenance free Chemical Earthing of Dual Pipe Technology of 3 Mtr long electrode with Outer pipe Diameter of 88 mm & inner pipe diameter 48 mm, Outer Surface of pipe shall be properly copper coated up to 250 Micron and Wall thickness of inner pipe 2.6 mm and 1.8 mm of outer pipe. The terminal for connection of 75 X 5.2 mm with two holes of 14 mm diameter. Fast Electrode is dully filled with the highly conductive material with sealing at both ends with lead terminal of 75 X 5.2 mm at top. The 88 mm Dia 3 Mtr Length Electrode should have type test report from CPRI. Type test report for Short time current of 42 kA rms for 1 Sec with initial peak of 88.2 kA. The Electrode should be tested in MSME Govt of India. The Electrode should be tested for Salt Spray Test as per BIS 117-09 for Corrosion for minimum 500hrs. Along with 2 bags of 25kgs each of Earth Enhancing Compound. The chemical compound should be tested and certified by any NABL accredited and BIS (Bureau of Indian Standards) accredited laboratory. The testing laboratory should be ISO 9001 & ISO 14001 certified. The earth enhancing compound should be tested referring to protocol IS 1350 & IEC62321/111/54/CDV. The pH value of compound should be between 7 to 8. The content of mercury (Hg) & Hex chromium should be below detection level. Make- FAST ELECTRODE or equivalent meke as approved by GE.(rate of GI strip of size 32x6mm upto 7.5 mtr length, GI protection pipe 40mm light grade & earth work deemed to be included in to rate quoted)
Providing and Laying of PVC Pipe line and Restoration to Moolai street and Agathiswarar kovil street perungalathur in ward No.56 in zone 4 TCMC
Earth work excavation and depositing on bank initial lead of 1.00mand lift of 2m in narrow trenches for laying of pipes for water supply in the following type of soils of sand,silt or othe loose soil ,wey sand or silt not under water light black cotton soil ,sandy loam and ordinary soil etc complete as per standard specification.
NIT No. 2(2026-27)/EE(C)Dr-III
A-2 Capital cost for Nayabans DSTP i/c SPS 1. Sewage Pumping Station (SPS) i/c including extension of sewer lines and laying Rising Main upto inlet chamber of the DSTP. 2. Decentralized Sewage Treatment Plant (DSTP) i/c Boundary wall etc complete. 3. Disposal main upto disposal point, i/c pumping station.
Operation and Maintenance 10 MGD Surface water treatment plant (both for Civil and E and M component of works)......in District- Howrah, for a period of 30(Thirty ) months.
Operation and Maintenance 10 MGD Surface water treatment plant (both for Civil and E&M component of works) including supply of coagulants (Alum & PAC), Liquid Chlorine, cleaning compound, Sludge disposal and supply of required laboratory reports etc. for 10MGD WTP constructed under State scheme (Phase-II)within the premises of Padmapukur WTP, in District- Howrah, for a period of 30(Thirty ) months.
DEPOSIT Elamkunnappuzha Panchayath Laying 90mm PVC Pipe at Belbow link road(Masjid Road) in Ward 18 and20 of Elamkunnappuzha Panchayath Pipeline Work
100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes.
Laying of HDPE Pipe line from Arapokhari Pump House to Nuagarh Habitation of Nuagaon GP for PWS to Arapokhari Under Naugaon Block
Supplying all labour,T&P, for laying in trenches High Density Polythene pipes and specials of following outsisde diameter and class 1 to 3 jointing by fusion welding method including testing as per specification confirming to IS: 4984-1995 with ISI marked specials & fittings & testing as per specification etc. complete as per the direction of Engineer-in-Charge. ( pipes are to be supplied by contractor with pre & post delivery inspection certificate from CIPET and manufacturing test certificate from the manufacturer).