Loading…
Loading…
15,948 results • Best match
Under District Ambedkarnagar, Reconstruction Of A Dilapidated Residential Building In Katehri, Block Of Ambedkar Nagar District., Lot No 1
Providing and laying water proofing treatment in sunken portion of WCs, bathroom etc., by applying cement slurry mixed with water proofing cement compound consisting of applying : a) First layer of slurry of cement... consisting of applying : a) First layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound @ 0.253 kg/sqm. This layer will be allowed to air cure for 4 ...
CONSULTANCY SERVICES, COMPREHENSIVE DESIGN AND PROJECT MANAGEMENT UPTO COMPLETION OF ENTIRE PROJECT FOR PROVISION OF DEFICIENT MARRIED ACCOMMODATION FOR OFFICERS (LT CDR AND ABOVE) AT INS MANDOVI
(D) Lift & Fire Systems Design and BOQ preparation for lift installation and fire alarm system as per applicable standards. (E) External & Allied Works Design of roads, drainage, arboriculture/landscaping works and other external services.(F) Estimates & BOQ Preparation of detailed estimates, BOQs, ...
Construction of 10 Bedded Hospital at 42nd Bn ITBP, Jodhpur , Rajasthan.
Providing and laying integral cement based water proofing treatment including preparation of surface as required for treatment of roofs, balconies, terraces etc consisting of following operations: (a) Applying a... operations: (a) Applying a slurry coat of neat cement using 2.75 kg/sqm of cement admixed with water proofing compound conforming to IS. 2645 and approved by Engineer-in-charge over the ...
Providing and laying of HDPE Interlink work at Pichampalayam and Chinna Pomma Naiken palayam in Ward No 16 and 17
Earth work excavation and depositing on bank with initial lead and lift as initial of 10 M and lift of 2 M in narrow trenches for laying of pipes for water supply works in Hard stiff clay, stiff black cotton, hard red earth shales, murram gravel, stoney ...
PROVN OF CENTRAL MAGZINE FOR STORAGE OF AMN AND EXPLOSIVE AT JAK RRC UNDER GE (W) JABALPUR
Sch 'A' Part-III (External Water supply) Lump sum price worked out by the contractor for (External Water supply) as listed in Schedule 'A' Part-III against the lump sum price inserted by the MES.
R and M work for nigam bldg under division office bhinder udaipur
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes (IS 15778 : 2007 code) having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings i/c fixing the pipe with clamps at 1 metre spacing. This includes jointing of pipes & fittings with one step ...