Loading…
Loading…
16,067 results • Best match
Operation and Preventive Maintenance of (1) Raiyadhar WTP (2) Raiyadhar Pumping Station (3) Nyara Off take Pumping Station for Two Years.
Sewage Treatment Plant, Water treatment plant, Swimming pool, Head works, Annual
M-R to Canal system of Dy-3 of KSMC from Ch. 0.00 to Ch. 40.00 and Dy-L-6 from ch 0.00 to 40.00 under Bolpur Irrigation Sub Division within Mayurakshi South Canals Division.
Earthwork in excavation in the canals/drainage channels/ borrowpits/ Riverbed/ slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. form a to 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge. a) Local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil.
M-R to canal system in between ch.100.00 to ch.220.00 of Dy-4 of BKBC in Block and PS -Bolpur-Sriniketan, Dist.- Birbhum of Bolpur (I) Sub-Division under Mayurakshi South Canals Division.
Earthwork in excavation in the canals/drainage channels/ borrowpits/ Riverbed/ slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. form a to 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge. a) Local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil.
M-R to Canal system of Minor-2 of Dy-2 of KSMC in between Ch. 0.00 to Ch. 200.00 under Bolpur Irrigation Sub Division within Mayurakshi South Canals Division.
Earthwork in excavation in the canals/drainage channels/ borrowpits/ Riverbed/ slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. form a to 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge. a) Local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil.
Development of Ladu Siterwan road by way of WBM G-2 and RCC Spun Pipes
P/L Reinforced Cement Concrete Pipes NP4 for Cross drainage on ist class Bedding of Granular material in single row fixing collers in cement mortar 1:2 including Excavation, backfilling maintaining power gradient and all other option with carriage,complete job MORTH clause 2900. A) 18 " dia
Construction of 25 new classrooms in government higher primary and High schools in Devarahubballi, Kalakeri, Halligeri, Devagiriand Kyarakoppa villages of Dharwad Taluk. Kumbarkoppa, Kashenatti, Kambarganavi and Dupenatti villages of Alnavar Taluk and Construction of 3 new classrooms in the Preuniversity college in Dastikoppa village of Kalaghatagi Taluk ( Total 28 classrooms).
36 Category : Vol - 2 -Chapter -13- Water Supply & Plumbing Work 0 291 291 11 3201 8.8 0.01