Loading…
Loading…
96,186 results • Best match
Laying of Pipe DI line
eProcurement System Government of Haryana Created By: Harjinder Singh Created Date/Time: 04-Jun-2026 01:44 PM Tender Title: Laying of 100mm i/d DI Pipe... Tender ID: 2026_HRY_523573_1
Laying of Distribution Pipe Line
NS Item -Providing and Insertion of W/S pipeline 100 mm i/d M.S. pipe (Fe-330 grade) fabricated as per IS:1239 of 1991, from steel plates conforming to IS:2062, by providing Roller arrangement for smooth insertion and anchoring of pipe through out the length with HDPE spacers at a distance of 2 meters apart to avoid contract of carrier pipe including cutting, jointing, radio graphically welding as per IS:1182 Hydraulic testing complete in all respect and also with cement mortar lining 2-3 mm thick on inner surface including cartage of material to site of work complete in all respect as per satisfaction of Engineer-in-Charge. M.S 100 mm i/d 5.00 mm thick.
Laying of DI Pipe line
Laying of distribution pipe line
Improvement Works to the Sewage Treatment Plants ( 40 MLD) at Naanjundapuram Under AMRUT 2.0
Labour charges for the erection of submersible pumpset in borewell/openwell including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days.
Improvement Works to the Sewage Treatment Plants ( 70 MLD) at Ukkadam Under AMRUT 2.0
Labour charges for the erection of submersible pumpset in borewell/openwell including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days.