Loading…
Loading…
96,186 results • Best match
Improvement Works to the Sewage Treatment Plants ( 60 MLD) at Ondipudur Under AMRUT 2.0
Labour charges for the erection of submersible pumpset in borewell/openwell including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days.
Annual Maintenance Estimate
[20.63.6]`Providing, lowering, laying in trenches, aligning, fixing in position and jointing Ductile Iron (DI) ISI marked K-9 grade SandS pipes as per 15:8329-2000 (amended up to date), with internal cement mortar lining for potable water with rubber ring (EPDM/SBR) joints as per IS: 5382-1985 (excluding special accessories) complete including all material, labour, hydraulic testing and commissioning as per Technical Specifications and as per direction of Engineer. Note: E/W to be measured and paid separately. ` 6. 350 mm i/d
Annaul Maintenance estimate for main water works in Sector-1, Rohtak for the year 2025-2026.
[20.68.1]Providing, lowering, laying in trenches, aligning, fixing in position and jointing at all level/depths Ductile Iron (DI) standard specials plain /flanged/ socketed confirming to IS9523-2000 with rubber ring (EPDM/SBR) joints such as tees, bends, tapers, caps etc. with in trenches in DI pipe line complete including all material, labour, testing and commissioning along with pipe line as per Technical Specifications and as per direction of Engineer. 1. Up to 300mm dia
Annaul Maintenance estimate for main water works in Sector-1, Rohtak for the year 2025-2026.
NS Item) Supplying and Dozing of Alumina Ferric Grade-IV/V Type-I confirming to IS 299/2012 for flocculation of drinking water including loading-unloading, carriage etc. complete in all respect.
Annaul Maintenance estimate for main water works in Sector-1, Rohtak for the year 2025-2026.
AMRUT-2.0-THRISSUR WATER SUPPLY SCHEME -Design, Construction and Commissioning of 20 MLD Water Treatment Plant by demolishing the existing 14.50 MLD Water Treatment Plant at Peechi -General Civil Work-1