Loading…
Loading…
96,302 results • Best match
Annaul Maintenance estimate for main water works in Sector-1, Rohtak for the year 2025-2026.
[20.68.1]Providing, lowering, laying in trenches, aligning, fixing in position and jointing at all level/depths Ductile Iron (DI) standard specials plain /flanged/ socketed confirming to IS9523-2000 with rubber ring (EPDM/SBR) joints such as tees, bends, tapers, caps etc. with in trenches in DI pipe line complete including all material, labour, testing and commissioning along with pipe line as per Technical Specifications and as per direction of Engineer. 1. Up to 300mm dia
Annaul Maintenance estimate for main water works in Sector-1, Rohtak for the year 2025-2026.
NS Item) Supplying and Dozing of Alumina Ferric Grade-IV/V Type-I confirming to IS 299/2012 for flocculation of drinking water including loading-unloading, carriage etc. complete in all respect.
Annaul Maintenance estimate for main water works in Sector-1, Rohtak for the year 2025-2026.
AMRUT-2.0-THRISSUR WATER SUPPLY SCHEME -Design, Construction and Commissioning of 20 MLD Water Treatment Plant by demolishing the existing 14.50 MLD Water Treatment Plant at Peechi -General Civil Work-1
PROVIDING AND LAYING STP TREATED WATER SUPPLY DISTRIBUTION PIPE LINE FOR VARIOUS PARKS IN SECTOR-45 and SECTOR-52 ZONE-IV UNDER MCG.Recall
Provision for providing and fixing water supply connection From 300mm Existing water supply pipe line complete in all respects(detail attach)
UNDER MINOR ORIGINAL WORK PROVIDING TILES, PLUMBING WORKS, BASINS, DRAINAGE LINE, WATER SUPPLYING PIPE LINES, COLOURING, CHAMBER REPAIRING, WATERPROOFING, PROFILE SHEETS AND OTHER WORKS AT COURT BUILDING AT PULGAON TA DEOLI DIST WARDHA
UNDER MINOR ORIGINAL WORK PROVIDING TILES, PLUMBING WORKS, BASINS, DRAINAGE LINE, WATER SUPPLYING PIPE LINES, COLOURING, CHAMBER REPAIRING, WATERPROOFING, PROFILE SHEETS AND OTHER WORKS AT COURT BUILDING AT PULGAON TA DEOLI DIST WARDHA