Interception And Diversion work for tapping nallah and setup sewage treatment plant for Used water management for AMANGANJ Town
Interception & Diversion work for tapping nallah and setup sewage treatment plant for Used water management for AMANGANJ Town
Laying of PVC pipe line for water supply Entrusting work
Earth work, excavation and laying of PVC pipe line for the water supply use including clearing, leveling the site and depositing the surplus earth work etc., Note: 1. Approximate length of 1500 mtrs. 2. As per E-Tender scope of work and terms and condition
Supply of Liquid Chlorine Turners for Water Purification at Water Supply Water Treatment Plant at Malegaon for the year 2026-27
Supply of Liquid Chlorine Turners 900 Kg Supplier Container (900 Kg Per Turner=16768)
REPAIR WORK OF ELECTRICAL COMPONENTS AT ASHTI LIFT IRRIGATION SCHEME.
eProcurement System Government of Maharashtra Created By: Subhash Bagewadi Created Date/Time: 20-Mar-2026 06:08 PM Tender Title: REPAIR WORK OF ELECTRICAL COMPONENTS AT ASHTI LIFT IRRIGATION SCHEME. Tender ID: 2026_WRDMN_1280703_1
Maintenance and repair works of sewer lines and plumbing in the subdivisional office and colony in Veltur colony of Ambhora Lift Irrigation Scheme and construction of toilets for Ladies and Gents.
eProcurement System Government of Maharashtra Created By: PRASHANT GODE Created Date/Time: 17-Feb-2026 02:33 PM Tender Title: Maintenance and repair works of sewer lines and plumbing in the subdivisional office and colony in Veltur colony of Ambhora Lift Irrigation Scheme and construction of toilets for Ladies and Gents. Tender ID: 2026_CEWRD_1270020_3
REPAIR AND MAINTENANCE OF WATER SUPPLY INSTALLATION AND WATER TREATMENT SYSTEM IN TECH AREA AT AFS KANPUR.
M&L for earthing complete with galvanized mild steel earth plate electrodes 600x600x6mm thick buried directly in ground to a depth not less then 2.25m deep below ground level with top edge of the plate not less then 1.5 m below normal ground level surrounded with adequate quantity of charcoal dust mixed with salt to a packed thickness of 15 cm all around to the plate, using GI strip 32 x 6 mm as earth strip electrode bolted or rivited to earth plate at one end and connected to equipments at another end, GI earth strip encased in and including 40 mm dia GI light grade pipe from upper end of earth plate up to equipment 20 mm dia bore GI pipe light grade as water pipe from earth chamber to upper edge of earth plate, Test point, GI funnel with wire mess fixed on water pipe and PCC 1:2:4 type B1(using 20 mm graded crushed stone aggregate) as in pit chamber and RCC pit cover 50 mm thick precast RCC 1:2:4 type B1(using 20 mm graded crushed stone aggregate) duly reinforced with MS round bar 6 mm dia @ 100 c/c both way with 10 mm dia MS TMT bar as in lifting handles, excavation, earth work including laying of GI Pipe concealed in floor and wall all as described in electrical plate of SSR Part-I including testing on completion complete all as specified and as directed.