Loading…
Loading…
9,970 results • Best match
REPAIR/MAINT OF WATER SUPPLY INSTLN AND DISTRUBTION AND SEWAGE INSTLN INCLUDING PIPELINES, MOTOR AND PUMPS ETC AT MIL STN ABOHAR
M & L repairs to water supply pipe line for removing leakage / blockage of GI pipe line 15mm to 40 mm bore including providing gasket /socket/tee/elbow/bend/union/nipple, washers, nuts,bolts, making thredes etc. by carryout necessary excavation in any type of soil, return filling, removing, dewatering as required earth work as required complete all as specified and directed by Engr-in-charge. Note :- Earth work and GI pipe will be measured and paid seperatly.
Providing and laying water supply pipe line to Salgame road left side, Vishweshwarayya badavane 1st and 2nd stage, royal appolo school adjecent roads, Dasarakoppalu 2nd stage and mavinahalli village in hassan CC Limits
Providing and laying water supply pipe line to Salgame road left side, Vishweshwarayya badavane 1st and 2nd stage, royal appolo school adjecent roads, Dasarakoppalu 2nd stage and mavinahalli village in hassan CC Limits
PROVIDING AND LAYING OF 110MM DIA HDPE PIPE LINE AT DIFFERENT PLACES OF MANAWAR
PROVIDING AND LAYING OF 110MM DIA HDPE PIPE LINE AT DIFFERENT PLACES OF MANAWAR
Additional laying of Pipe line for improvement of FHTC functionality by UPVC pipe line and Augmentation of PH-1,PH-2,PH-3,Earth filling and Boundary wall of PH-1,PH-2,PH-3 for BULBULCHANDI piped Water Supply Scheme at Habibpur Dev. Block in the Distr
N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be produced before laying of pipe line. ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list. iii) No part payment at any stage on account of supply of materials shall be entertained. iv) Payment will be made on actual consumption of materials. v) UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list. vi) Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so. vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate of entire item. viii) All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill. v)UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list. vi)Submission of completion drawing of pipe line showing all specials,valves, etc with final bill is mandatory.(Cost of drawing will be paid seperately). vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and deduction for such work will be made accordingly. viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill.
Providing and laying 450mm dia RCC NP-3 Pipe sewer line and 150mm dia Water Supply Line at H. No. 1136 wali gali, Saran School Road, Jawhar colony in ward No.8, NIT Faridabad (Recall)
Providing and laying 450mm dia RCC NP-3 Pipe sewer line and 150mm dia Water Supply Line at H. No. 1136 wali gali, Saran School Road, Jawhar colony in ward No.8, NIT Faridabad
Construction of Additional pump house with Intake Structure at Anadinni along with laying of MS pipe line from proposed additional pump house to already laid raising main of WTP for water supply scheme to Navanagar Bagalkot on Turnkey Basis
Construction of Additional pump house with Intake Structure at Anadinni along with laying of MS pipe line from proposed additional pump house to already laid raising main of WTP for water supply scheme to Navanagar Bagalkot on Turnkey Basis