Loading…
Loading…
9,970 results • Best match
PIPELINE REPAIR and MATERIAL PURCHASE FOR DRINKING WATER SUPPLY IN 4 VILLAGES OF TADASA GP
PIPELINE REPAIR and MATERIAL PURCHASE FOR DRINKING WATER SUPPLY IN 4 VILLAGES OF TADASA GP
Repair of 300 MM i/d Inlet pipe Channel, Repair of SS Tank, Repair of existing 3 no. filter beds 8.60 mtr dia. Site Laying, Repair of Pump Chamber, Pumping Machinery and all other works contingent there to
Improvement / Sustainability of Existing Rural Water Supply Scheme for Village Siryewala, Block Bhagta Bhaika, District Bathinda (Under 15th FC) Name of Work:- Repair of 300 MM i/d Inlet pipe Channel, Repair of SS Tank, Repair of existing 3 no. filter beds 8.60 mtr dia. Site Laying, Repair of Pump Chamber, Pumping Machinery and all other works contingent there to."
Construction of Water Supply Pipeline Repairs At Yashvantnagar Tq Manora Dist Washim Under 15th Finance Commission 2024-2025
Construction of Water Supply Pipeline Repairs As per Estimate
RENEWAL REPAIR AND RENOVATION OF EXTERNAL WATER SUPPLY PIPELINES FROM KUDDAN NALAH TO BAKHLOH CANTT UNDER AGE (I) DALHOUSIE
Supply and fixing of cast iron sluice valve for water supply purpose with C.I. drilled flanged ends (both ends) (integrally cast), stem of SS (AISI410) and bronze (gun metal), class PN- 1.6 conforming to IS- 14846, ISI marked with stainless steel spindle and iron wheel including jointing material complete such as rubber insertion packing rings with adequate size and requisite numbers nut, bolt and washer of size 150 mm bore, complete all as specified and as directed.
Providing Laying and Jointing of HDPE Pipe Line (90mm dia {8kg/sq.cm}) for Distribution System. Ward No. 01,02,06,08,09,10,11 and 15 (Estimated Area)
Laying of Pipe Line and Installation of Pumping Set at Keval Vihar Chauraha
Providing and laying S&S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS : 8329 — 600 mm dia Ductile Iron Class K-7 pipes. [NOTE: This DSR item is COMPREHENSIVE and includes: (i) supply/procurement of pipe at site, (ii) carting from store to laying position, (iii) laying in position, (iv) jointing of pipes with rubber ring gasket push-on joints, and (v) testing of all joints complete as per IS:8329 and direction of Engineer-in-Charge]