Loading…
Loading…
9,970 results • Best match
Dedicated Pipe laying for better Functionality and Providing Balance FHTC for MAHIL Water Supply Scheme at Gazole Block of Malda district under Malda Division, PHE Dte. Govt. of West Bengal, (2nd Call)
Providing FHTC from the existing CI/DI/uPVC/HDPE/GI/AC distribution pipeline by Installing 10 mm NB Gun-metal Ferrule conforming to I5 2692:1989 with latest amendments on the said pipeline with supply, fitting & fixing of all other accessories like saddle piece of required size to fit the existing distribution pipeline, specials, nut & bolts, rubber sheet, washers etc and supply & laying of 15mm NB PVC (schedule 80)/20mm OD HDPE (PE100, PN16)/20mm OD PPR-C (Class-SDR7.4/PN16) pipes upto required length with all necessary specials 1.0 metre below the ground connecting the ferrule including cutting trenches in all sorts of soil and filling up trenches as per direction of the Engineer-in-charge and upto a point just inside the premises of the household or as directed by EIC. Supply and installation of a 15mm dia. alloy iron Bib Cock (tested to 21 Kg/cm2) above 1.0 Mtr. from ground, an alloy Stop Cock of 15 mm dia. with brass spindle (tested to 21 Kg/cm2) to be fitted in a position as directed by E.I.C. G.I pipe of TATA make (medium duly) of 2 metre length with all necessary specials to continue from the end of the PVC/HDPE/PPR-C pipe and upto 1.0 m above ground within the premises of household. Note:- 1. PVC pipe shall of Schedule 80 (medium duty) conforming to ASTMD -1785 and threaded to match with GI Pipes as per IS: 1239 (Part-1). 2. PPR-C (Poly propylene Random copolymer) pipe shall be 3-layer confirming to IS:15801 UV stabilised & anti-microbial fusion welded, having thermal stability for hot & cold water supply including all PP-R plain & brass threaded polypropylene random/fittings. 3. Rate is exclusive of supply and delivery of 10mm NB gun-metal Ferrule. Supply & laying of 15 mm NB PVC (schedule 80/20mm OD HDPE (PE100, PN16)/20mm OD PPR-C (Class-SDR7.4/PN16) pipes.
Laying Distribution of UPVC pipe line for improvement of Functionality of Ranghat Water Supply Scheme at Chanchal-II Block of Malda District under Malda Division, PHE Dte, Govt. of West Bengal.
HORIZONTAL ROAD CROSSING: Horizontal road crossing by Augor-boring including boring charge, pipe laying and jointing, making baricates, lighting arrangement etc. all complete as per direction of E.I.C. For 80 mm dia. to 200 mm dia. pipes.
Laying & providing, Fixing D.I. pipe line at Chandni Chowk To Hanuman Mandir.
Laying & providing, Fixing D.I. pipe line at DJ Court to Hata ground.
Special repair to water supply pipeline at 2W Det Goa under GE Gomantak Vasco
Excavation in trenches not exceeding 1.5 m wide and not exceeding 1.5 m deep in hard/dense soil for foundation, etc. or for laying of pipe line/ cable etc. n exc 10 sqm on plan and getting out complete all as specified and as directed.
Laying of D.I pipe and allied works for gap negotiation in distribution system for ADATALA Piped Water Supply Scheme at Bamongola Block in the District of Malda under Malda Division, PHE Dte.
Carrying CI/DI pipes with specials and valves and lowering placing in position and laying carefully inside the trenches in proper alignment and gradient etc. including earth work in excavation of adequate width as per specification having min. clear cover from top of pipe is 1.10mtr. below existing ground level in any kind of soil including mixed with boulder, road sub-grade and its flank,but excluding moorum and laterite and stone etc.without damaging the exisiting telephone/electric cable etc.(in case of damaged if any type of cable line during excecution , necessary damaged charges as applicable by the respective authority will be borne by the agency in his own cost) preparing the bottom surface for continuous bedding of pipe line and laying pipes, fitting, fixing specials and valves with bailing out water if any including carriage of pipes, specials and valves from local deptt. store within 8KM and back filling the trenches with excavated earth in layers to original condition as per specification and direction of EIC. The surplus materials after execution of work are to be return to the deptt. store.