Loading…
Loading…
9,966 results • Best match
Laying MS pipe and allied works including Adopting trench less technology (e.g. Jack Pushing Method etc) for crossing of concrete road at B.D.O. quarter complex for improvement of water supply arrangements at Patalnagar water supply scheme, MD Bazar
Trial run for water supply for 4 days and repairing of leackage and other distrubtion during water supply as per direction of EIC
PROVIDING AND LAYING OF WATER SUPPLY PIPELINE IN SECTOR 12A WARD 26, DIV 4B UNDER MCG Recall
PROVIDING AND LAYING OF WATER SUPPLY PIPELINE IN SECTOR 12A WARD 26, DIV 4B UNDER MCG.
AMRUT 2.0 PROVIDING 24 x 7 WATER SUPPLY AT PADAVARAD 28 EDAKKUNNI 29 OF THRISSUR CORPORATION OLLUR ZONE WATER AUDIT SURVEY AND HYDRAULIC MODELLING OF 24X7 WATER SUPPLY SYSTEM Pipeline Work
OD17844/2026-2027:Conduct Topographical survey of the proposed project area, Assess Existing system (actual hours of supply, NRW%, pressure range etc.) in consultation with KWA, Demonstrate Storage adequacy OHSR using balancing calculations, Conduct Evidence-based baseline assessment while converting intermittent to 24×7 water supply, Conduct Detailed conditional assessment/ gap analysis of existing infrastructure (Intakes, Pumping Stations, WTPs, OHTs, distribution networks, tap connections etc.). Integrate existing infrastructure in proposed network, Hydraulic analysis of existing infrastructure in respect to proposed water demand etc to be done as per direction from department officers. (DMA-wise NRW assessment, Water balance calculation (IWA methodology), Identification of apparent and real losses, Leak detection strategy and NRW reduction plan, Recommendation for NRW cell formation)-All design and Document preparation to be done separately for two DMAs. All survey/design datas to be submitted in forms of report/ drawings and submit in digital format also. Assist in DPR preparation. Census data of previous decades also required. Present population in proposed DMA is to be identified and population projection to be submitted with calculation (method wise piopulation forecasting and methodology adopted for final population projection and justification also required, ) Other water demand such as domestic, institutional, commercial, firefighting, floating population etc. to be identified. determination of storage requirements also required.Review of existing city-level water supply system, Collection and validation of secondary data from ULB, Assessment of Water sources, allocation,reliability, quality ,Per capita supply, coverage, pressure, continuity, Raw water mains, feeder mains, service reservoirs, Distribution network, valves, meters, SCADA, NRW / UFW status ,Calculation of Service Level Benchmarks (SLBs), Condition assessment of assets, Validation of ULB-identified priority, Operational Zone / DMA and Preparation of As-Is Assessment Report also required. Overall scheme layout plan/maps of complete scheme to be prepared and provided in consultation with KWA. Detailed engineering drawings to be prepared and provided for the following such as ULB Plan with road network, reservoir Locations, hydraulic particulars of reservoirs, etc. ,Reservoir command area plans , Ward plan ,Flow Chart of the water supply system ,Primary network plan with valve and other locations.,Operational Zone plan ,DMA Plan with Distribution network, Bulk flow meters, hydraulic parameters ,Residual pressure drawing in DMA with critical control points and Detailed Hydraulic model Calculations of DMA and output. Hydraulic design to be done and submitted. Finalization of design parameters as per CPHEEO DFT Manual- Identification and finalization of: Operational Zones; Pressure zones in 2 DMAs (size, boundaries, isolation), GIS-based hydraulic modelling (e.g., EPANET), Pipe network analysis and optimization, Nodal pressure analysis and boosting requirements, Design of :Distribution rehabilitation / replacement; Valves, PRVs, FCVs; Bulk and consumer metering. Validation of transmission mains and surge analysis. SCADA, Automation & Digital Systems- Assessment of existing automation systems, Recommendations for: SCADA architecture (DMA / city level), Flow, pressure, water quality monitoring, IoT / telemetry / digital twin solutions, Integration strategy with GIS and MIS, Capital cost estimation (SoR + market rates), O&M cost estimation, Financial feasibility analysis, Tariff analysis and cost recovery assessment, Sensitivity and sustainability analysis, All design and Document preparation to be done separately for two DMAs. All survey/design datas to be submitted in forms of report/ drawings and submit in digital format also and submit DPR
Upgradation of water works and construction of boosting station laying of DI pipe line
H.S.R. Items Kasani Kalan village:- Upgradation of existing water works, construction of boosting station and laying of DI pipe distribution system in village Kasani Kalan, District Bhiwani, `Upgradation of water works, construvtion of boosting station and laying of DI pipe line distribution system in village Kasani Kalan and all other works contingent thereto". Estimate Cost: Rs Rs 154.20 Lakhs
GENERAL-.-Laying of PVC/ GI pipe for irrigation at Chadayan Para Lift Irrigation Scheme , from chainage 0.00 to 600 meters - vilayur panchayath-General Civil Work-1
18.9.10:Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings. This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching , refilling & testing of joints complete as per direction of Engineer- in-Charge. External work150 mm nominal dia pipes
Laying of 200mm dia HDPE pipe line and Interconnections to existing pipe line from TIDCO houses to YSR colony, in Ward no.38 Chilakaluripet Municipality under 15th FC 2020-21 (1st Inst) Tied Grant