Loading…
Loading…
10,198 results • Best match
aintaining water supply of Tube Wells in AC 06 by Automation and Supervisor.
REPAIR/ UPGRADATION OF B/R ITEMS TO WATER SUPPLY INSTALLATIONS AT MIL STN KOTA
M & L for 3- layer PP-R (Polypropylene random copolymer) pipes 16 mm dia outer dia, SDR 7.4 (PN-16) pipes UV stabilized and antimicrobial fusion welded having thermal stability for hot & cold water supply including fittings PP-R plain & brass threaded type polypropylene random laid in trenches/floor at places where directed complete all as specified and as directed.
AUGMENTATION OF WATER SUPPLY SCHEME FOR OTM AND MD ACCN UNDER GE (N) AKHNOOR
Supply and lay Pipes ERW Steel including specials, nominal dia 200 mm of thickness 6.0 mm all as specified and directed.
Cleaning of CWR and OHSR reservoir of various water supply scheme under sub division Tibbi
Cleaning of CWR & OHSR reservoir of various water supply scheme under sub division Tibbi
Special Repair and Renovation of Water Supply and Sanitation Sub Division Office Amloh at saunti, Fatehgarh Sahib, Punjab
Special Repair & Renovation of Water Supply & Sanitation Sub Division Office Amloh at saunti, Fatehgarh Sahib, Punjab
Sustainability Support to Community Managed Water Supply Schemes - 2025-26 -Repair and Maintanance of Pullancheri WSS in Kuzhimanna Grama Panchayath, Malappuram District
Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 32 mm nominal outside diameter pipes.