Loading…
Loading…
9,021 results • Best match
WARD NO-18 ME MAIN ROAD SE UPSABHAPATI KE GHAR TAK HDEPE PIPE CONNECTION EVAM 5 HP BOARING KA NIRMAN KARYA
3 Approved from PHED Providing and laying High Density Polyethyene pipe (HOPE pipe) of 20 mm to 225 mm 00 and pressure 6.0 Kglcm2 and 10 Kg/cm2 sutable for water supply which is available in all standard, like 181·498411995 and various grades like PE·80,... profit and overhead charges all complete as per direction of Engineer·in· charge.HDPE pipe of materials grade PE100· PN10 (dia in I _. mm)
PROVISION OF ADDITIONAL TOILET BLOCKS FOR LIVING IN BILLETS AT AF STN UTARLAI
Lump sum price worked out by the Contractor for Internal Water Supply as listed in Sch `A’ Part- III
REPAIR/ REPLACEMENT AND MAINTENANCE OF BUILDING PANELS ALONGWITH ALLIED WORKS AND REPAIR/ REPLACEMENT AND MAINTENANCE OF STORAGE TYPE WATER HEATERS, CEILING FANS, WALL FANS, EXHAUST FANS AND ELECTRIC METERS UNDER GE (AWC) MHOW
Taking down carefully storage type water heater (geysers) of 25 litres capacity for servicing after disconnecting existing water supply and electric connection by unscrewing / cutting of holding bolts / nuts from walls and... re-assembling after repairs and fixing the same in its original position and making necessary water supply and electric connection and testing complete all as specified and directed. Note:- The ...
Construction of Conference Hall at Tanashram Police Line Jaisalmer (Entire Society)
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step ...
civil work
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step ...
COMPLETION OF INCOMPLETE WORK FOR CONSTRUCTION OF 96 X OR MD ACCN AT DSSC WELLINGTON
M & L for laying DWCPE sewage pipe line 150mm dia of pipe including sealing of joint, fittings etc., with collars complete all as specified and as directed.