Loading…
Loading…
9,958 results • Best match
LAYING UNDER GROUND DRAINAGE PIPE LINE & CC ROAD AT MUSLIM BURIAL GROUND BACK SIDE VADDERAGUDEM 1ST LINE TO PONNURU ROAD IN DIV.NO.13 UNDER AE-11 SECTION
Engaging of labour including all charges etc complete (house drainage connections with all type of necessary charges excluding pipe laying. Plumber
Supply and Commissioning of Manual and Robotic system capable of inspecting water supply pipelines with diameters ranging from 80 mm to 2200 mm along with the Operation and Maintenance support for 3 years with all setup including vehicle and staff
Supply and Commissioning
REPAIR AND MAINTENANCE OF STPs FILTER MEDIA SEWAGE PUMPS AIR BLOWERS CONNECTED PIPELINE NETWORK ALONGWITH MISC ITEMS OF STPs AND RAPAIR MAINTENANCE DEVELOPMENT OF RECHARGE OF RAIN WATER HARVESTING AND IN THE AOR OF AGE U WATER SUPPLY NO I UNDER GE U
Supply & Fixing in replacement 3 Layer PPR pipes SDR 7.4 (PN16) UV Stabilized and antimicrobial fusion welded having thermal stability for hot and cold water supply including all PPR Plain and Brass threaded Fitting in replacement of old unserviceable PPR Pipe in trenches complete all as specified and directed.
SH Laying Jointing and testing of GI pipe of various dia including fittings accessories in various village i.e Nerti, Bhairoon, Churtha and Machhial under Section Rait
Excavation in foundation trenches etc. in earth work in all kinds of soil such as pick work, jumper work, blasting work soft /hard rock, chiesling soft /hard rock where blasting is prohibited, slushy, daldal and saturated soil I/c pumping or bailling out water with in all heights stacking the excavated soil with 15cm layer when required into plinth ,sides of foundations etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus earth as per direction of Engineer-in-Charge with in all leads and lifts .
Laying of SWG 250mm dia drain pipe and laying of CC patch road from H.No.3-7-561 to 3-7-553 at vidyanagar in Div No.51 Est. cost of Rs. 4.99 Lakhs under MGF (Reserved for SC Societies/Individuals)
Additional works for distribution main pipeline including interconnection and FHTC at Jhagra village(Paschim para) under RCFA Part-III Zone-I water supply scheme under RCFA Division-I PHE Dte.
Additional works for distribution main pipeline including interconnection and FHTC at Jhagra village(Paschim para) under RCFA Part-III Zone-I water supply scheme under RCFA Division-I PHE Dte. (Including 18% GST & 1% Cess)