Loading…
Loading…
9,917 results • Best match
COMPLETION OF INCOMPLETE WORK OF AUGMENTATION OF GEARING AND SHAFTING FACILITIES AT NSRY, SRI VIJAYA PURAM.
S&F 3-layer PP-R Polypropylene random copolymer) concealed pipes SDR 7.4 (PN16) UV stabilized and antimicrobial fusion welded having thermal stability for hot & cold water supply including all PP-R plain & brass threaded Polypropylene random fittings fixed complete to walls, ceilings or in floors etc of following size of pipe complete all as specified and directed :-
ADDITION ALTERATION OF ICV ABHAY WORKSHOP BUILDING No. P-264 SPECIALIST GARAGE P-201 AND TANK GARAGE P-202 AT VRDE, AHMEDNAGAR
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) 15mm nominal dia pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete all as specified and directed.
Construction of 6 shops and a toilet at Subhash Bazar, Municipal Council, Hamirpur.
Providing and fixing of Chlorinated Polyvinyle Chloride (CPVC) Pipes, having thermal stability for hot and cold water supply, including all CPVC plain and brass threaded fittings, inluding fixing the pipe with clamps at 1 m. spacing . This includes jointing of pipes and fittings with one step ...
Repair/Overhauling work of furnishing activity for ICF & LHB AC & Non-AC and all OCV/PCV coaches as per scope of work at Motibagh Workshop, Nagpur
M-Modification to pipe laying to waste water in LHB (AC & Non-AC)
Contraction of Interlocking Road Drain from Manfool Teli house to Ramzaan Teli house.
... and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site ...
Construction of PWS Scheme KOTROSHI Tal.MAHABALESHWAR, Dist- Satara
... existing distribution main of any type including excavation, breaking and removing existing pipes, lowering, laying of specials and pipes in their position, refilling, closing the water supply in that area, dewatering and restarting the water supply, etc. complete as directed by Engineer-in-charge for ...