Loading…
Loading…
9,922 results • Best match
Jankipuram yojna, Sector-J (Extension) Sargam apartment, sulabh awas ke samney samudayik kendra ka nirman karya.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step ...
REPAIR MAINT OF EXTERNAL CI DI GI PIPE LINES MOTOR AND PUMP STES STP CLEANING OF UG OH SUMP AND MISC CONNECTED ITEMS AT A A BANAR UNDER GE BANAR
... reservoir capacity of 8000-15000 Gallon at 60 feet staging by pumping out the accumulated water at the bottom using submersible pump,removing the complete slit by suction process using... suction pump or vacuum process, cleaning the walls, ceilling & floor using high pressure water jet with pressure up to 2300 PSI to dislodge all the mud,dirt,algea,fungus and layers ...
JBP Div. Renovation of Highmast including shifting of transformer in circulating area with shifitng of DG SET
Supply & laying of HDPE pipe 2"dia for crossing rly. track/platform/road / soil/ hard murrum rossing
CWEK/T-43/864 EWS/2026-27 SPL REPAIR OF BLDGS NO P-954, CHINAR AUDITORIUM AT BB CANTT, SRINAGAR IN THE AOR OF AGE B/R-I UNDER GE 864 EWS
M&L for lagging upto 20mm pipes used in internal water supply or plumbing all round with, 25 mm thick bonded mineral wool preformed ‘SNAP ON’ pipe sections of density 144 Kg/cum conforming to IS 9842 complete all as specified and directed by Engineer-in-charge.
Construction of a 5seater urinal (3 for men and 2 for women) on King Road, Municipal Council, Hamirpur.
Providing and fixing of Chlorinated Polyvinyle Chloride (CPVC) Pipes, having thermal stability for hot and cold water supply, including all CPVC plain and brass threaded fittings, inluding fixing the pipe with clamps at 1 m. spacing . This includes jointing of pipes and fittings with one step ...
Drain Repairing Work in New Established Ward No. 1 to 20
... and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site ...