Loading…
Loading…
9,413 results • Best match
Development of Hostel BHSS Badugam
Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes conforming to IS: 15801, UV stabilized and anti-microbial fusion welded, having thermal stability for hot and cold water supply including all PP-R plain and brass threaded Polypropylene random fittings. This includes... Engineer-in charge. Internal work-exposed on wall with clamps at 1.00 meter spacing PN-16 pipe, 16mm OD(SDR-7.4).
Modification of the life science lab in the 4th floor of the New MBA Block Building in the J.C. Bose University of Science and Technology YMCA Faridabad.
HSR Item 22.85.2 -Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply, including all CPVC plain and brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes and fittings with one ...
At Gorakhpur-Proposed Renovation of PCOM, PCCM & PCE office.
... DYCE-GA-ENGINEERING/NORTH EASTERN RLY 11.0 FLOORING 11.37S CERAMIC GLAZED TILES 11.37 Providing and laying Ceramic glazed floor tiles of Sqm 75 935.6 70170 size 300x300 mm (thickness to be specified ...
Repair and maintenance of toilet for Mahila Praharis behind temporary structures Being used by 05 Bn BSF at campus Mawpat under SHQ BSF Shillong
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings and fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step ...
Renovation of Toilets at Govt Institute of Leather and Footwear Technology Jalandhar
CONCEALED IN WALL: Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes as per IS 15778 (ISI marked with the prior approval of Engineer-in- Charge), having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings i/c fixing the pipe with clamps at ...
PETTY REPAIRS AND DAY TO DAY COMPLAINTS OF OTM AND MD ACCN AT SS VIHAR, ASSEY LINE, RAINA PARK, SJ VIHAR AND SOLANKI LINE UNDER AGE B/R-I OF GE (EAST) JALANDHAR CANTT
Cleaning of air lock in GI pipe and making the water supply available upto water taps including attending the complaints of no water supply & rectifying defects in water supply lines, complete all as specified and as directed.