Loading…
Loading…
9,966 results • Best match
Permanent Restoration of damage which caused due to pipe laying by KMDA For laying Raw water pipeline from existing PHE intake point at Dongaria, 24Pgs S to existing KMDA W.T.P. at Diamond Harbour Municipality along PWD Road under AMRUT 2.0 sch
Wet Mix Macadam Base Course Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including screening of aggregates and granular materials, premixing the material with water at OMC in Wet Mix Plant, carriage of mixed material by tipper to site. laying in uniform layers with Paver in Sub- base / Base course on well prepared surface and compacting with Vibratory Roller to achieve the desired density, including supply of all materials, machinery, fuel and lubricants, including incidental costs for lighting' guarding, barricading, making earthen bundh to protect the edges including cost of quality control complete as per Clouse 406 of Specifications for Rood & Bridge Works of MoRT&H (5th Revision) Pakur Variety
Supply and Laying of HDPE and GI Pipe Line
Supply and Laying of HDPE and GI Pipe Line
AMRUT-AMRUT 2- 24 x 7-Water Supply Proposal for Guruvayur Municipality-Water Audit Survey and Hydraulic Modelling of 24x7 Water Supply System-Pipeline Work
OD21643/2026-2027:Conduct Topographical survey of the proposed project area, Assess Existing system (actual hours of supply, NRW%, pressure range etc.) in consultation with KWA, Demonstrate Storage adequacy OHSR using balancing calculations, Conduct Evidence-based baseline assessment while converting intermittent to 24×7 water supply, Conduct Detailed conditional assessment/ gap analysis of existing infrastructure (Intakes, Pumping Stations, WTPs, OHTs, distribution networks, tap connections etc.). Integrate existing infrastructure in proposed network, Hydraulic analysis of existing infrastructure in respect to proposed water demand etc to be done as per direction from department officers. Census data of previous decades also required. Present population in proposed DMA is to be identified and population projection to be submitted with calculation (method wise piopulation forecasting and methodology adopted for final population projection and justification also required, ) Other water demand such as domestic, institutional, commercial, firefighting, floating population etc. to be identified. determination of storage requirements, detailed condition assessment / gap analysis of existing infrastructure (intake pumping stations, WTPs, OHTs, Distribution networks, tap connections etc required. Integration of existing infrastructure in proposed network also required. Review of existing city-level water supply system, Collection and validation of secondary data from ULB, Assessment of Water sources, allocation, reliability, quality, Per capita supply, coverage, pressure, continuity, Raw water mains, feeder mains, service reservoirs, Distribution network, valves, meters, SCADA, NRW / UFW status, Calculation of Service Level Benchmarks (SLBs), Condition assessment of assets, Validation of ULB-identified priority, Operational Zone / DMA and Preparation of As-Is Assessment Report also required. Overall scheme layout plan/maps of complete scheme to be prepared and provided in consultation with KWA. Detailed engineering drawings to be prepared and provided for the following such as ULB Plan with road network, reservoir Locations, hydraulic particulars of reservoirs, etc. , Reservoir command area plans , Ward plan , Flow Chart of the water supply system , Primary network plan with valve and other locations , Operational Zone plan ,DMA Plan with Distribution network, Bulk flow meters, hydraulic parameters ,Residual pressure drawing in DMA with critical control points and Detailed Hydraulic model Calculations of DMA and output. Hydraulic design to be done and submitted. Finalization of design parameters as per CPHEEO DFT Manual- Identification and finalization of: Operational Zones; Pressure zones in 2 DMAs (size, boundaries, isolation), GIS-based hydraulic modelling (e.g., EPANET), Pipe network analysis and optimization, Nodal pressure analysis and boosting requirements, Design of :Distribution rehabilitation / replacement; Valves, PRVs, FCVs; Bulk and consumer metering. Validation of transmission mains and surge analysis. SCADA, Automation & Digital Systems- Assessment of existing automation systems, Recommendations for: SCADA architecture (DMA / city level), Flow, pressure, water quality monitoring, IoT / telemetry / digital twin solutions, Integration strategy with GIS and MIS, Capital cost estimation (SoR + market rates), O&M cost estimation, Financial feasibility analysis, Tariff analysis and cost recovery assessment, Sensitivity and sustainability analysis, All design and Document preparation to be done separately for one DMA. All survey/design data to be submitted in forms of report/ drawings and submit in digital format also including DPR preparation.
Laying of HDPE Water Supply pipe line from D.No 4-7-320-B1 to 4-7-320-B4 at SBI Colony of Pulivendula Municipality
Manufacture, Supply, & Delivery of HDPE Pipes conforming to IS 4984 - 2016 including transportation to anywhere in A.P, excluding all taxes (Supply up to 90 mm dia. in coil & above 90 mm dia. straight length.)
Additional laying of Pipe line for improvement of FHTC functionality by different dia UPVC pipe and FHTC for KUTUBSAHAR piped Water Supply Scheme at Gazole Dev. Block in the District of Malda under Malda Division, P.H.E.Dte. (2nd Call)
Supplying, laying, fiting, fixing and jointing of UPVC pipes conforming to IS:4985-2000 with latest revision and amendments, if any, with necessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S. specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick payment without damaging the existing telephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as applicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good quality/approved brand solvent cement (as per IS:14182-1994 including cost of all fabricated PVC fitting i.e. tees,bend, reducers, adopter etc.as per IS:101-1988 and making flange joints including supplying required quantity of nuts, bolts and rubber insertion (CIDF sluice valves will be supplied by the department free of cost) as required at site by adopting suitable method so as to facilate the maintenance of pipe line locally as per conventional method including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining an average depth of cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C.
Excavation LAYINGG OF HDPE PIPE LINE / BOOSTING STATION/PUMSET (1st time for L and C Society only)
Pipe Line