Loading…
Loading…
9,966 results • Best match
Water Supply Handpump Repair and Pipeline Repair in Thirukkurungudi TP
Additional laying of Pipe line for improvement of FHTC functionality by different dia UPVC pipe and Providing FHTC for DUBA KHOSKAN piped Water Supply Scheme at Gazole Block in the District of Malda under Malda Division, P.H.E.Dte. (2nd Call)
N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be produced before laying of pipe line. ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list. iii) No part payment at any stage on account of supply of materials shall be entertained. iv) Payment will be made on actual consumption of materials. v) UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list. vi) Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so. vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate of entire item. viii) All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill. v)UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list. vi)Submission of completion drawing of pipe line showing all specials,valves, etc with final bill is mandatory.(Cost of drawing will be paid seperately). vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and deduction for such work will be made accordingly. viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill.
Laying HDPE pipe line in place of old damaged pipe line at diffrent ward at Alirajpur Dist Alirajpur
Laying HDPE pipe line in place of old damaged pipe line at diffrent ward at Alirajpur Dist Alirajpur
Providing laying of Upgradayion of 10 inch dia 12 inch dia UPVC SN8 Pipe Sewer line and 4 inch DIK 7 Water Supply line at Ekjot Nagar
Providing laying of Upgradayion of 10 inch dia 12 inch dia UPVC SN8 Pipe Sewer line and 4 inch DIK 7 Water Supply line at Ekjot Nagar
Estimate for providing and laying 100mm dia DI pipe water supply line K-7 from Maszid to Shiv Colony in ward no. 31 old Faridabad Div-III.(Recall)
Estimate for providing and laying 100mm dia DI pipe water supply line K-7 from Maszid to Shiv Colony in ward no. 31 old Faridabad Div-III.
Boring and installing of 200mm id tw Straight upto depth 225 mtr. BGL with Reverse Rotary Rig Const. of OHSR 75000 ltrs capacity Prov. laying cutting jointing and testing of PVC pipe and all other works contingent there to
Bifurcation Of Water Supply Scheme Ratolan, Block Sunam, District Sangrur (Bifurcation From Wss Chatha Nanhera) “Boring and installing of 200mm i/d tubewell Straight upto depth 225 mtr. BGL with Reverse Rotary Rig including stainless steel strainer & M.S. Pipe, Construction of OHSR 75,000 ltrs capacity, Construction of Pump Chamber, Providing & installing Submersible Pumping set, Rising main, Providing, laying, cutting, jointing & testing of PVC pipe, construction of SV houdies, water connection, P/f Water Meter C.I delivery main, Prov. & installation Chlorination Plants, Solar Panel Energy System, Development of Water Works site and all other works contingent there to Under Nabard XXXI