Loading…
Loading…
9,504 results • Best match
Construction of Boundary wall, Guard Hut and Store Shed at 132 KV GSS, Bhiyad, Distt. Barmer
(S-240/2.37.1) Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes (IS 15778 : 2007 code) having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings i/c fixing the pipe with clamps at 1 metre spacing. This includes jointing of pipes & fittings with one step ...
PROVN OF AVIONICS ENGINEERING COMPLEX AEC AT AFS TAMBARAM
EXTERNAL WATER SUPPLY : Material and labour for cutting of existing 150/100mm CI /DI pipe line and taking of 80 mm dia branch connection and including inserting Tee of suitable size to connect existing pipe line (except CI/DI specials) complete all as specified and as directed.
As per tender documents
Supply and replace PVC connection 15mm dia 60 cm long complete with brass flair nuts at both ends (ISI marked and suitable for hot water supply upto 100 degree celcius), complete all as specified and directed.
REPAIR MAINT TO PUMP SETS, MOTOR, CHLORONOME PLANTS AT 20WG AFS AND 46 WEU AND REPAIR MAINT TO PUMP SETS, MOTOR, CHLORONOME PLANTS, WATER TREATMENT PLANTS, RCC OH TANKS, TESTING OF WATER IN EVERY QUARTER AT 273 SU AFS AND UNDER GE (AF) BAGDOGRA
Transportation of submersible pump sets 3 phase any make and capacity 5 to 15 HP from pump house to contractor work shop for carry out necessary repair work to pump set submersible and transporting it back to site of water supply installation of AF Stn area complete all as specified and directed.
PROVN OF TWO ATTACHED BATHROOMS, SIG STORE AND ONE TOILET BLOCK AT DIFFERENT LOCATIONS OF BAGRAKOTE MIL STN UNDER GE SEVOKE ROAD
Supply, laying, jointing & testing 3-layer PP-R (Polypropylene random copolymer) concealed pipes, 20 mm outer dia, SDR 7.4 (PN16) UV stabilized and antimicrobial fusion welded having thermal stability for hot & cold water supply including all PP-R plain & brass threaded polypropylene random fittings such as bends, ...
1)Construction of compound wall (40m) and toilet arrangements near OHT, 2)Providing pipe line from OHT to newly constructed bath tub (295m), 3) Construction of bath tub for burial ground at L.Mlalaiyur
Earth work excavation hard stiff clay and hard rock earth and pipe laying, Jointing and refilling the trench with excavation soils including all labour charges etc.,complete