Loading…
Loading…
9,517 results • Best match
Repair and Maintanance of the office building of PWD (DWS) Division, Kamalpur, Dhalai, Tripura during the year of 2026-27
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step ...
Plantation Work
SITC of Radial / mixed flow ISI marked water and anti-corrosive liquid filled submersible motor pump sets suitable for 100/150mm dia... connection suitable for Bore well. The job includes labour part of lowering of riser pipe G.I./ H.D.P.E. with rope, cables & pump, installation of complete fitting and accessories, ...
REPAIR/ CLEANING OF SEWAGE LINE, SEPTIC TANK, SOAK WELL, MAN HOLES AND OTHER CONNECTED WORKS UNDER AGE B/R-II OF GE (NORTH) MEERUT CANTT
Cutting of roads for removing damaged drain pipes and laying of pipes with all neccessary fittings any length with collers, laid in trenches or in floors 150/200mm bore complete all as specified and as directed including making good the road cutting complete all as specified and directed. Note. pipe will be measured separately in respective item.
CONSTRUCTION OF AHMEDABAD HAAT FOR AATMNIRBHAR BHARAT @ T.P. 119 , F.P 197, 206 IN NIKOL WARD OF EAST ZONE AHMEDABAD MUNICIPAL CORPORATION (RE-INVITE-3)
stability for water supply including all UPVC plain and brass threated fitting. This includes jointing of pipes and fittings with one step UPVC solvent
SPL REPAIR TO BLDG NO P-175, 176 (GUARD ROOM) AND MAIN GATE OF HARBAKSH DWAAR AND OTHER SANCTIONED WORKS UNDER AGE B/R-II OF GE (E) JRC
Supply only integral water proofing compound all as specified
Supply, Installation, Testing and Commissioning of On-Grid Ground Mounted / Rooftop, 110 KW Solar Power Plants with Automation (SCADA, PLC) at STP , Meherpalli, Bhubaneswar
RCC Foundations for GI post pillars with necessary excavation ,Shuttering,reinforcement,cement conconcrete of M-20 to the designed depth with 50MT/ bars, construction of foundation for PV structure contour (Area grading and clearing of jungle) and laying of water pipelines for cleaning including cost of materials, transportation to site,all labour,T & P etc alll complete.