Loading…
Loading…
9,735 results • Best match
Upgradation of residential quarters of Gouri Township under Gouri Pouni Sub Area
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step ...
PROVN OF MTR AND S COMPLEX AT AF STATION LEH
Total amount of Sch 'A' PART-VIII (Section-I) (EXTERNAL WATER SUPPLY)
Renovation of Washrooms, Classroom Upgradation and Allied Civil Works in the E and TC Extension Building, COEP Tech, Pune
Removing urinal pans or wash hand basins with frame including disconnecting the sanitary and water supply connections, removing the same carefully and stacking the serviceable materials as and where directed including throwing the unserviceable materials outside etc complete
Construction of Borewells, U/G Water Storage Tanks, Water Haurvesting System (with borwell) and Other Misc. Civil Works at 18 E.C. Road UPCL Campus, Dehradun.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step ...
Repair and maintenance work in Basement Floor and Room no. 1 and 2 of VIP Guest House, Teesta V Power Station, Balutar Civil and Electrical works.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step ...
C/O ORs accommodation, stable and training shed at camp of 48 Bn ITBP at an altitude of 12600 feet and a distance of approx. 18 km from Chungthang, Distt-Mangan, North Sikkim connected with road and further approx. 9 km on foot from nearest roadhead
Providing and fixing Polyethelene-Aluminium-Polyethelene PE-AL-PE Composite Pressure Pipes conforming to IS - 15450, U.V. stabilized with carbon black having thermal stability for hot & cold water supply, capable to withstand temperature up to 80°C, including all special fittings of composite ...