Loading…
Loading…
9,921 results • Best match
PROVN OF TWO ATTACHED BATHROOMS, SIG STORE AND ONE TOILET BLOCK AT DIFFERENT LOCATIONS OF BAGRAKOTE MIL STN UNDER GE SEVOKE ROAD
Supply, laying, jointing & testing 3-layer PP-R (Polypropylene random copolymer) concealed pipes, 20 mm outer dia, SDR 7.4 (PN16) UV stabilized and antimicrobial fusion welded having thermal stability for hot & cold water supply including all PP-R plain & brass threaded polypropylene random fittings such as bends, ...
1)Construction of compound wall (40m) and toilet arrangements near OHT, 2)Providing pipe line from OHT to newly constructed bath tub (295m), 3) Construction of bath tub for burial ground at L.Mlalaiyur
Earth work excavation hard stiff clay and hard rock earth and pipe laying, Jointing and refilling the trench with excavation soils including all labour charges etc.,complete
Construction of Directorate Administrative Building and Staff Quarters at Goa.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) 15 mm nominal dia Pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step ...
82.Construction of pathway in cemetery behind Anupam Hotel on Purbiya Tola Road.
Supply Of Water Tanki………….............…..All complete.
COMPREHENSIVE REPAIR/MAINT TO CERTAIN BLDGS AT MH COMPLEX IN THE AOR OF AGE B/R HAIG LINE UNDER THE AOR OF GE DEOLALI
Fixing only 15mm bore tubes, any grade, to walls and ceilings or laying in floors including cutting chases in stone,concrete block or slab wall pinning in making good to facing where required the sufraces for concelled water supply fitting complete all as specified.
PROVN OF CCTV MONITORING ROOM AND ASSOCIATED WORKS AND ARBORICULTURE WORK IN HQ OPS COMPLEX OF PTS AT AF STN AGRA
Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, including forming bottom surface for laying of pipes/ cable etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in soft/loose soil complete all as specified and directed.