Loading…
Loading…
10,001 results • Best match
Improvement of wharf of Good shed shunting neck by released PSC sleeper, renovation of toilets and bathroom of existing merchant and labour room and patch repair of damaged platform of goods shed at Tilda.
... CENTRAL RLY 44 Description:- Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings including fixing the pipe with clamps at 1.00m spacing. This includes jointing of pipes & fittings with one step ...
Jehanabad-Provision of Office and Quarter for ADEN/JHD
... stone Sqm 160 545 87200 47 aggregate 11.37S CERAMIC GLAZED TILES 11.37 Providing and laying Ceramic glazed floor tiles Sqm 50 935.6 46780 of size 300x300 mm (thickness to be specified ...
SPECIAL REPAIR/REPLACEMENT OF OLD RUSTED GI PIPE LINE AT NAPPIER LINE AT NEW CANTT PRAYAGRAJ
Supply and laying in 3 layer PP-R Poly propylene random copolymer) concealed pipes SDR 7.4 (PN16) UV stabilized and antimicrobial fusion welded having thermal stability for hot & cold water supply all PP-R plain & brass threaded polypropylene random fittings laid in trenches. PPR Pipes ...
6 Sect/Engr/MW/2026-27/245
Providing and fixing 20 mm nominal dia Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Concealed work, including cutting chases and making good the walls etc
Construction of CC Road and Drain from HN 1G1 to 1G22, 1F1 to 1A19, 1A22 to 1A56, 1K1 to 1K18, 4B1 to 4B19, 4D1 to 4D18, 4G11to 4G20, 4H1 to 4H20, 4I11 to 4I20, 4L12 to 4L32 at Ward 70 Kota
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes (IS 15778 : 2007 code) having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings i/c fixing the pipe with clamps at 1 metre spacing. This includes jointing of pipes & fittings with one step ...
Repair and painting work of four toilets in the court complex.
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply and all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step ...