Loading…
Loading…
10,264 results • Best match
Annual Plan- Chavara block Panchayath Pro. No 224/2025-26-Drinking Water Facilities and Other Allied Works at Chavara Block Office-Re-Tender
water supply and plumbing
REPAIR / MAINT OF TILING, FLOORING, ROOF CEILING, PLUMBING, SANITARY, FITTINGS, JOINERY, PANELLING, STONE MASONRY INTERNAL WIRING, FITTING AND FIXTURES, DISTRIBUTION BOXES, SUBMAIN WIRING, MCCB AND CONNECTED ALLIED WKS AND PERIODICAL SERVICES OF P
... Labour for PCC(1:1 1/2:3) , Type A-O ,using 12.50 mm graded stone aggregate with integral water proofing compound as per manufacturer instructions on bottom of sunken portion wint proper slope towards spout. Note: Water proofing compound shall be measured and paid seperately under appropriate item of Schedule ...
RENOVATION WORK OF LIBRARY BUILDING LOCATED IN SHASTRI NAGAR SCHEME, GHAZIABAD
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge.20 mm nominal outer dia Pipes. DSR 18.9.2/2023 (274.30 x 0.762 + 3% = 215.28 )
SPECIAL REPAIR OF BLDG NO P-24 OF CG BN AT BASE CAMP-II UNDER GE 873 EWS
S&F 3-layer PP-R Polypropylene random copolymer) pipes SDR 7.4 & SDR 11 UV stablised and antimicrobial welded having thermal stability for hot & cold water supply including all PP-R plain & brass threaded polypropylene random fittings fixed complete to walls, ceilings or in floors of 25 mm outer dia complete all specd and directed.
SPECIAL REPAIR OF BLDG NO P-23 OF 5 JAT AT BASE CAMP-III UNDER GE 873 EWS
S&F 3-layer PP-R Polypropylene random copolymer) pipes SDR 7.4 & SDR 11 UV stablised and antimicrobial welded having thermal stability for hot & cold water supply including all PP-R plain & brass threaded polypropylene random fittings fixed complete to walls, ceilings or in floors of 25 mm outer dia complete all as specified and directed.
Repairs and Relaying of 200 mm dia SWG Pipe line in Koneru Chennakesava Road in 9th Division Work Division-III area. 1st Call General Funds
Supply and Delivery Lowering laying of SWG pipes in readymade trench true to alignment and gradient jointing, and testing of stonewell pipes including cost of jointing materials such as cement mortor (1:1) proportion and hemp yam including cost and convyeance of all materials. For 200 mm dia