Loading…
Loading…
10,239 results • Best match
Construction of Compound wall at Paswari Well Headwork under M&R Kutiyana Group
The amount recoverable from the contractor by the Gujarat water supply and sewerage Board on any account shall be liable to be recovered
BIENNIAL MAINTENANCE CONTRACT FOR ASH DYKE AT NTECL VALLUR
Supplying water tanker of minimum 6000 liters for watering the grass turf sods for the entire length of the Ash dyke bund (3 trips per day) mounted... lubricant, operator/ driver, road taxes etc... required for.the same and any other cost for watering. The rate is inclusive of the fuel (diesel), driver, potable water etc... complete. (Good water supply is in the scope of the agency)
civil work
... and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site ...
Construction of Tin Shed for the rehabilitation of Gadia Lohar and Marubhat Community in Maharana Pratap Colony in Sangod City.
... and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site ...
Maintenance and Repair to Fire Fighting System Pipe Lines, Stand Post, Hydrant Valves, Hose Boxes etc. at INS Kalinga, DRDL, INS Karna and NAD Bheemunipatnam
Supplying and laying MS ERW Pipe, 150 mm bore, Medium Grade, conforming to IS – 1239 including all fittings such as bends, tees, short pieces, connectors, elbows, reducers, union, sockets etc., welding to CI / MS Pipes to make leak proof joints, laid in floors or fixed to walls and ceilings including testing ...
Development of Varanasi Airport-Diversion of existing services (Electrical works)
Laying of HDPE Pipe in underground for laying of cable across taxi or runway/road at depth of upto 3 mtr through HDD Method along with supply and laying of 4mm nylon rope with the pipe etc complete as required. 200 mm