Loading…
Loading…
57,411 results • Best match
Construction of 1024 No. Manhole Chambers, 50 No. Flushing Tanks, 1024 No Inspection chambers, Laying, Jointing Testing of DI pipe, Providing Laying Jointing and Testing of HDPE Pipe 160mm dia for Zone 2
Laying jointing and testing of D.I. Pipe spigot and socketed pipe with CML ( SBR tyton push on joints) complete in all respect as per IS 8329-2900 class K-7 as per standard dimension, weight and test pressure complete in all respect as latest ammendments or addition. complete in all leads and lift as specification and direction of the Engineer-in-charge.
1. Providing Laying And Fixing PVC Pipe For Under Ground Drainage In Indira Nagar Primicess At Kakadgaon 2. Providing Laying And Fixing PVC Pipe For Under Ground Drainage In Rajwada Primicess At Kakadgaon
1. Providing Laying And Fixing PVC Pipe For Under Ground Drainage In Indira Nagar Primicess At Kakadgaon 2. Providing Laying And Fixing PVC Pipe For Under Ground Drainage In Rajwada Primicess At Kakadgaon
PROCUREMENT OF K 7 DI PIPE FOR LAYING OF DISTRIBUTION PIPE LINE FOR JAMURIA BOROUGH I (PART) UNDER AMRUT2.0 (PHASE II) WITHIN AMC
Supply and delivery at site ISI Mark Socket and Spigot jointing system centrifugally cast DI (K7) Pipes conforming to IS 8329-2000 (Third revision) in standard length 4 m, 5 m, 5.50 m, 6 m for push-on joint (rubber gasket) with internal cement mortar lining and external protection byblue metallic zinc coating with finish layer of Synthetic resin/ bituminous coating of outside as per IS: 8329-2000 specification with necessary jointing material rubber gasket (IS: 5382:1985) including transportation, loading unloading and stacking at site including free supply of polyethylene sleeves for Water Supply Projects at Jamuria Borough I under AMRUT2.0 scheme within Asansol Municipal Corporation.
laying of Damaged UGSS 200mm DI Pipe Under Ground Sewerage pipe line at Postal Nager, Murugesan Naicker st in Ward No.23
Barricading work (Where, there is less traffic areas and broader roads etc.) for laying of pipe line using casurina poles at 1.50m center to center (8cm to 10cm dia and 1.80m height) vertical with horizontal poles in three rows including painting the vertical poles in the road facing sides with ready mix paint, tying the vertical and horizontal poles with coir rope including fixing charges and fixing 75mm dia reflectors including earth work excavation for fixing vertical posts and finally removing and stacking the materials safely for further use etc., complete and as directed by TWAD Board officers.
laying of Damaged UGSS 200mm DI Pipe Under Ground Sewerage pipe line at Postal Nager ,Balakrishnan Naicker st in Ward No.23
Barricading work (Where, there is less traffic areas and broader roads etc.) for laying of pipe line using casurina poles at 1.50m center to center (8cm to 10cm dia and 1.80m height) vertical with horizontal poles in three rows including painting the vertical poles in the road facing sides with ready mix paint, tying the vertical and horizontal poles with coir rope including fixing charges and fixing 75mm dia reflectors including earth work excavation for fixing vertical posts and finally removing and stacking the materials safely for further use etc., complete and as directed by TWAD Board officers.
LINK CONNECTION WITH LAYING OF WATER SUPPLY 100 MM DIA. D.I. PIPE ALONG WITH INSTALLATION OF CESC METER BOX NEAR 19/5B, D P P ROAD, WARD 100, BR-X