Loading…
Loading…
57,789 results • Best match
Repairing Maintenance of WTA and Additional Laying of UPVC Pipe line at Parergram-I Major RLI Scheme
Laying of PVC pipes of different diameters within field trenches in curve/ straight line including using UPVC fittings, Viz. Horizontal and Vertical Bends, riser pipes, Tee Reducer etc.and making leak proof joints with couplers after roghening the surface with wire brush and emery paper and applying solvent cement (The rate is inclusive of transport of pipesfittigs and solvent cement to be supplied by deptt.) all complete asper direction of Engineer-In- charge. ii) 200 mm. dia
Repairing Maintenance of WTA and Additional Laying of UPVC Pipe line at Parergram-II Major RLI Scheme
Laying of PVC pipes of different diameters within field trenches in curve/ straight line including using UPVC fittings, Viz. Horizontal and Vertical Bends, riser pipes, Tee Reducer etc.and making leak proof joints with couplers after roghening the surface with wire brush and emery paper and applying solvent cement (The rate is inclusive of transport of pipesfittigs and solvent cement to be supplied by deptt.) all complete asper direction of Engineer-In- charge. ii) 200 mm. dia
Laying New Pipe Line At All Sansad Under Mugkalyan GP Areaunder 15th CFC TIED Activity code 111270798
eProcurement System of Government of West Bengal hosted at WB-SDC Created By: Goutam Dutta Created Date/Time: 03-Mar-2026 09:27 AM Tender Title: Laying New Pipe Line At All Sansad Under Mugkalyan GP Areaunder 15th CFC TIED Activity code 111270798 Tender ID: 2026_ZPHD_5012479_1
Laying of Dirty water Disposal Rcc pipe line from Shop of Kavar Singh to Johar at village Fadani
Laying of Dirty water disposal RCC Pipeline from Shop of Kavar Singh to Johar at Village Fadni (VAGY) Block Dharuhera Distt Rewari.
DAY TO DAY MAINT RECITIFICATION OF LEAKAGE IN WATER SUPPLY PIPELINE AT FEROZEPUR CANTT UNDER GE (WEST) FEROZEPUR CANTT
All as per Srl item No.36 here-in-before but without any material for attending the complaint of No Water Supply and check the complete system i.e float Valve, sluice valve at the respective pump houses and rectify the same within same day and ensure proper restore of water supply complete all as specified and directed. Note :- If water supply complaint not attended by the contractor within same day or till 12 hrs then recovery @ Rs 1500 per complaint per day shall be recovered from the contractor.
laying jointing and testing of GMS tube and HDPE pipe of various dia at various locations
Laying, jointing and commissioning of HDPE (High Density Polyethylene pipes) of following diameter and class confirming to IS 4984-1995 with fusion welding process including all necessary fittings & bends in all leads and lifts to the entire satisfaction of Engineer-in-charge.(Earth work in trenches to be measured and paid separately) PE/PN6