Loading…
Loading…
3,698 results • Best match
O M Sewerage Schemes TSS Mace Running contract 2026 27 Robotic cleaning of manholes for eliminating manual scavenging during operation and maintenance of sewerage system under Sewerage Section No 2 Kuriathy Robotic cleaning Sewerage work General Ci
OD1258/2026-2027:Removal of dumped earth, silt, deposits received from Manhole etc by lorry for Minimum mechanical conveyance and disposing at muttathara sewage treatment plant
P L of Inte and Dive Sewer Const of Manhole Chamber Const of IPS Construction of MPS Laying of Rising main Dera bassi Part A Const of STP 3.00 MLD 3.50 MLD and 7.50 MLD including FSTP 9 KLD 10.50 KLD and 22.50 KLD Dera bass
Part B (3.0 MLD STP cum FSTP 9 KLD)
Used Water Management Project in Shohratgarh Nagar Panchayat Distt- Siddharthnagar.
Survey (GIS based), Soil investigation, Engineering, Design (hydraulic and structural) as required, procurement of all labour & material, T&P etc. for completion of various components under “Used Water Management Project in Shohratgarh Nagar Panchayat Distt. Siddharthnagar”. It includes Interception and Diversion works of all existing drains, conveyance network and establishment of Centralized/ De-centralized Sewage Treatment Plant(s) based on open technology, inclusive of 7 KLD Co-Treatment facility for Fecal Sludge/ Septage, ensuring the final effluent parameter strictly complies with the National Green Tribunal (NGT) latest guidelines i.e. BOD10mg/l, TSS 20mg/l, Nitrogen-Total10mg/l, Total Phosphorus 1mg/l, Fecal coliform100 MPN & COD50mg/l The cost includes cost of Civil, E&M and instrumentation works in suitable foundation for I&D, conveyance network, STP(s) with inlet chamber, pre-treatment units (including one stand-by unit), Primary/ Secondary Treatments, Disinfection, Disposal of treated sewage by gravity/pumping (as required), Sludge Thickening, Sludge dewatering units with necessary piping work with valves, gates, drains, pathways etc. all complete as turnkey job. The STP shall also have flow meters installed at inlet, outlet and bypass, level sensors, PLC/SCADA Automation and required instrumentations including IP based CCTV during construction. The cost shall also include required power DG sets, Electric Substation, Transformers and foundation, pumps and Control Panels, SCADA & Meter room, Administrative building cum Laboratory cum Store room, boundary wall 1.8 m high with main gate wicket gate & other required buildings) and disposal of treated effluent, with all other associated works at Shohratgarh Nagar Panchayat District Siddharthnagar, U.P, India.
Used Water Management Project in Badhni Bazar Nagar Panchayat Distt- Siddharthnagar.
Survey (GIS based), Soil investigation, Engineering, Design (hydraulic and structural) as required, procurement of all labour & material, T&P etc. for completion of various components under “Used Water Management Project in Shohratgarh Nagar Panchayat Distt. Siddharthnagar”. It includes Interception and Diversion works of all existing drains, conveyance network and establishment of Centralized/ De-centralized Sewage Treatment Plant(s) based on open technology, inclusive of 5 KLD Co-Treatment facility for Fecal Sludge/ Septage, ensuring the final effluent parameter strictly complies with the National Green Tribunal (NGT) latest guidelines i.e. BOD10mg/l, TSS 20mg/l, Nitrogen-Total10mg/l, Total Phosphorus 1mg/l, Fecal coliform100 MPN & COD50mg/l The cost includes cost of Civil, E&M and instrumentation works in suitable foundation for I&D, conveyance network, STP(s) with inlet chamber, pre-treatment units (including one stand-by unit), Primary/ Secondary Treatments, Disinfection, Disposal of treated sewage by gravity/pumping (as required), Sludge Thickening, Sludge dewatering units with necessary piping work with valves, gates, drains, pathways etc. all complete as turnkey job. The STP shall also have flow meters installed at inlet, outlet and bypass, level sensors, PLC/SCADA Automation and required instrumentations including IP based CCTV during construction. The cost shall also include required power DG sets, Electric Substation, Transformers and foundation, pumps and Control Panels, SCADA & Meter room, Administrative building cum Laboratory cum Store room, boundary wall 1.8 m high with main gate wicket gate & other required buildings) and disposal of treated effluent, with all other associated works at Badhni Bazar Nagar Panchayat District Siddharthnagar, U.P, India.
Preparation of Detailed Project Report (DPR) for Sewerage line System Under Phase-II in Municipal Area Sumerpur
Preparation of Detailed Project Report (DPR) for the Sewerage System/sewer gap and related works in Sumerpur.The scope of work included survey, planning, design, and preparation of the DPR for the sewerage system; providing, laying, jointing, testing, and commissioning of sewerage infrastructure and allied works; design, construction, supply, installation, testing, and commissioning of Sewage Pumping Station (MPS), if required; preparation of DPR for Sewage Treatment Plant based on SBR process; shifting of main trunk lines from escape channels; and planning for reuse of treated waste water for SumerpurTown.
Providing laying cutting testing of Sewer RCC Np 3 with HDPE lining and Rising main D I K 9 pipe const M H Chamber Hatch box MPS and Survey Design Supply and Soil Testing Const Inst Comm of 20 MLD STP cum 60 KLD FSTP including O and M Gurdaspur
Survey, Design, Supply & Soil Testing Construction, Installation, Commissioning of 20.00 MLD Sewerage Treatment Plant Cum (60.0 KLD) FSTP respectively based on any suitable sustainable & proven biological technology works including O & M sixty months only for STP & FSTP after stabilization period of 3 months or more at Town & Distt. Gurdaspur. (SBM 2.0 Scheme).