Loading…
Loading…
3,731 results • Best match
by way of Design and Const. of 4.5 MLD STP, Const. of Interception and Diversion structures at outfalls, conveying mains, IPS incl. O and M for 5 years after successful completion of free trail of 12 months Contract No. SDJ/W/45/2026-27
V. Infrastructure Facilities for 4.50 MLD STP: Complete site development, including onsite infrastructure facilities (within the premises) yard lighting , CC Road 3.5m wide, construction of the peripheral Compound Wall with Chain Link Fencing and MS Gate, and offsite (linking) infrastructure facilities external electrification, necessary power connections, transformer, and metering Providing external water supply connection at STP, along with Rising Main for peak flow rate as per CPHEEO specifications/ Guidelines, with screen channel, including effluent disposal arrangement/clear water pump station & electrical substation incl transformer. The selection of sewage treatment plant criterion will be guided by the least life cycle cost and latest effluent discharge standard. The plant shall include the complete civil, mechanical, electrical and instrumentation components including on-line Continuous Effluent monitoring system (OCEMS) for Treated effluent at the site and shall ensure that the discharge standards as per design parameters are met as per proposed technology (all Civil, E&M Components) including DG Set, electromagnetic flow meters (at Inlet &outlet), Servo Voltage stabilizer (AVR) of required capacities and scope of work and design shall be based on sound engineering and prevalent norms. All necessary infrastructure connected with STP shall have to be got designed and vetted from reputed Government Institute viz IIT Jammu /NIT Srinagar/Govt Engg College Jammu. The scope shall also include all taxes, lift and leads complete. STP will have SCADA system so that whole plant can be operated from control room & linked to all IPS at one point and all relevant information is available in control room at any given point. etc complete item of work as per standard specification &tender. Special Condition of Contract (SCC) Design & Drawing Submitted by the Contractor& Approved by Competent Authority As directed by the Engineer in Charge.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; CHART TABLE POLISH, QM TABLE REPAIR, FITMENT OF DINING HALL, STORE OFFICE, WARDROOM PANTRY, IT, STP COMPARTMENT LOCKERS, FITMENT OF UTENSIL RACKS AT WARD R..
STP COMPARTMENT LOCKERS
Day to day repair, preventive maintenance, operation by providing Supervisor and O and M Manpower for Electrical installations, Lift, HVAC, FPS system, STP, WTP and RO system round the clock of Critical Care Block at Alipurduar,(one year).
Day to day repair, preventive maintenance, operation by providing Semi skilled Manpower for STP, WTP & RO system round the clock at Critical Care Block Alipurduar in the premises of Alipurduar SDH for the period of one year - under the jurisdiction of WBMSCL obeying the all type of Terms & Condition as per annexure.
Survey Investigation and designing Hydrographic Hydraulic Structural etc of Construction of Drain From Lakshmi Gate to STP Plant to Sudha Vihar Colony Gate no 2 to Highway in Jhansi including supply of all material labour Tand P etc
Survey, Investigation and designing (Hydrographic, Hydraulic, Structural etc.) of Construction of Drain From Lakshmi Gate to STP Plant to Sudha Vihar Colony Gate no 2 to Highway in Jhansi
REPAIR MAINTENANCE OF SEWAGE INSTALLATIONS, CLEANING OF SEWAGE UG SUMPS AND ALL TANKS AND, SUPPLY OF CHEMICALS AND MBBR MEDIA AND CONNECTED ELECTRICAL EQUIPMENTS AT AYODHYA CANTT UNDER AGE (I) AYODHYA
Cleaning / Desludging of existing MBBR tank of sewage treatment plant Himachal Niwas 650KLD capacity (total two times in the contract period) and getting out sludge through sucking super soccer machine and depositing to a distance exceeding 1.5km but n. exc .2km outside MD land at isolated place.Straining pvc media and cleaning with clean water and reuse for proper functioning complete .Note- (i) pumping out sludge water from equaliser tank by using Diesel engine operated pump and necessary diesel is to be arranged by Contractor complete as directed by Engr-in-charge.
Replacement of existing RCC 1200 mm id Rising Main with DI K7 Pipe from 25 MLD STP to Abul Khurana Drain, Providing and Fixing Pump Sets, Construction of Pump Chamber, Collecting Tank, Meter at Abohar (under UIDF Tranch 3)
Replacement of existing RCC 1200 mm i/d Rising Main with DI K-7 pipe from 25 MLD STP to Abul Khurana Drain, Providing and Fixing Pump Sets, Construction of Pump Chamber, Collecting Tank, Meter Room and Elevated Shaft, complete in all respect and all other works contingent there to at Abohar, Distt Fazilka.