Loading…
Loading…
3,823 results • Best match
Installation Arsenic free water plant near Nazrul Par house at Taranipur Sansad VI XVFC Tied
Installation of Water Treatment Plant
Installation of arsenic free water plant near Jhantu Debnath house at Gobindapur Sansad XI XVFC Tied
Installation of Water Treatment Plant
GE (N) P/TOKEN - 20 OF 2026-2027 SPL REP TO ROOF TREATMENT ON PERMANENT BLDG NO- 16 IN THE AREA OF AGE B/R EAST UNDER GE NORTH PUNE
M & L water proofing treatment to RCC roof slab including parapet comprising of the following course of treatement / specified from bottom to top (a) Applying Bituminous primer @ 0.40 Ltr per Sqm over plastered surfaces of roof including parpet surfaces. Bituminious primer shall be 'Tar Mastic' manufactured by M/S STP LTD or 'EMW FLATE' manufactured by M/S Texsa India Ltd. (b) Over the priming coat laying one layer APP based polymeric membrance of approved manufacturer, 3mm thick of weight not less than 3.60 Kgs/Sqm reinforced with non woven polyester fabric weight not less than 150 gms per Sqm. Polymeric members shall be taken to a height of 60cm (minimum) and then inserted inside the groove of parapet wall and shall be finished by a membrance flashing. (c) Application of two coat of bituminous aluminium paint over the polymeric membrane after necessary preparation and cleaning. Note :- (i) Laying APP based polymeric membrance shall be done by torch on method or as per manufacturers instructions. (ii) A minimum overlap of 100mm shall be made at the end and 75mm shall be made at the sides of the polymeric membrance respectively and sealed all ovelaps and joints as per Manufacturers instructions. (iii) APP based polymeric membrance shall be "SUPER THERMOLAY" manufactured by M/S STP LTD or MOPOLY FP manufactured by M/S Texsa India Ltd.
T-13/EUDCB/2026-27
STP-70 Pole (13 Mtr.)
Procurement of CCTV based Security and Surveillance setup for NTPC Vindhyachal Township area
Connector: RJ45 STP
Engagement of Special Third Party Independent Techno Financial Auditor for Techno Financial Audit SBM 2.0 under the jurisdiction of Punjab Water Supply and Sewerage Division No. 2, Patiala
1 Providing and Laying of Sewerage system, Construction of MH Chambers, Main Pumping Station including Pumping machinery, Pipes and specials, Rising main, Hatch Box, Vertical Shaft, dismantling and reconditioning of Roads, complete in all respects and all other works thereto & Construction, Installation, and Commissioning of 2 MLD STP cum FSTP 6 KLD at Ghagga Distt. Patiala based on any suitable, sustainable and proven biological technology including other appurtenant works on turnkey basis as per DNIT, Including Operation & Maintenance for a Period of 60 months after stabilisation period of 3 months or more. at Ghagga Distt. Patiala (Under SBM-2) 0