Loading…
Loading…
3,840 results • Best match
REPAIR / MAINT OF EXTERNAL WATER SUPPLY AND CONNECTED ITEMS AT AF STATION DWARKA AND KHAMBHALIYA UNDER GE (AF) JAMNAGAR NO.2
Deployment of man power for Collecting the sample of water, from different point such as under ground sump, RO plant and sewage treatment plant for chemical testing of water from reputed Govt Laboratory for iron content in water, PH value, Hardness, turbidity, chloride, fluoride and other parameters as per IS standard. Submitting the test report to Engr-in-Charge complete all as specified and directed.
Supply and Erection and Commissioning (E and C) of air ducting (finished) complete with dampers, grills (with VCD and without VCD), supports (painted) and all accessories as specified in control room building at NTPC Korba FGD Site
QUANTUM OF WORKS INVOLVED IN PROVIDING NEW TRANSFORMER DUE TO OVERLOADING OF EXISTING TRANSFORMER AT DIFF. SITES IN BUSINESS PLAN YEAR 2026-27 UNDER THE AREA OF EDD-MAGARWARA UNNAO.
Erection of STP Double Pole (By put up a new STP adjacent to existing STP) below the existing 11 KV Line including digging of pits, fitting of all accessories (Top & Dropper Channels, X-arm, F-clamp, insulators etc. as required for existing single/double Ckt HT Line) along with cartage & dragging from dump site to pit site including all associated work.
Renovation and replacement of service lines including plumbing line and sewer lines of CMDS Complex
22.23.1:Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. The material shall meet the requirements as specified in ACI-212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the engineerin- charge. The product performance shall carry guarantee for 10 years against any leakage.For vertical surface two coats @0.70 kg per sqm
Supply Erection Installation Testing and Commissioning of Audio Video System for Conference Room s at NTPC VSTPS
Cable:CAT 6 STP Box/Drum
TNO.22/EDC2MT/2026-27
Maintenance Work of Protection of STP/PCC Poles with Plastic Sheet, Barricading of T/F (250 to 630 KVA T/F), during Kanwar Marg in the area EDSD-DAURALA, SARDHANA NAGAR SARDHANA DEHAT, under EDD-Sardhana, Meerut.