Loading…
Loading…
3,899 results • Best match
Provision of CCTV Cameras for Escalators at MYS, DVG and Lifts at, HAS, ASK, DRU, RRB, SMET, KRNR, TTR & SBHR Stations of Mysuru Division
Supply of STP CAT 6 cable as per latest specification. Above/
Janpad sre me sre to nagal road ke chainage 17.100 se 30.100 ta pole shifting work
STP-55 Pole 11 Mtr. Long
Additonal DT work Under EDD- Jhinjhak
STP 11 MTR LONG
Bhusawal(CZ) - Proposal for renovation/repairs of officer colony swimming pool work. (ZBB-25-26)
podiums, reservoir, sewage & water treatment
Special and External repairs to RAMAN Building in Colaba Residential Premises at TIFR Mumbai 400005
Providing and applying integral crystalline slurry of hydrophilic in nature for waterproofing treatment to the RCC structures like retaining walls of the basement, water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 parts integral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 parts integral crystalline slurry : 1 part water) for horizontal surfaces and applying the same from negative (internal) side with the help of synthetic fiber brush. The material shall meet the requirements as specified in ACI-212-3R-2010 i.e by reducing permeability of concrete by more than 90% compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystalline slurry shall be capable of self-healing of cracks up to a width of 0.50 mm. The work shall be carried out all complete as per specification and the direction of the engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage.
Waterproofing work on the roof of Executive Field Hostel located at Sewa-II Power Station (CW-731)
Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying: (a) after surface preparation, first layer of slurry of cement @ 0.488 kg/sqm mixed with water proofing cement compound@ 0.253 kg/sqm. (b) laying second layer of Fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. (c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/sqm mixed with water proofing cement compound @ 0.670 kg./sqm. and coarse sand @1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours.The entire treatment will be taken upto 30cm on parapet wall and tucked into groove in parapet all around. (d) fourth and final layer of brick tiling with cement mortar (which will be paid for separately)For the purpose of measurement the entire treated surface will be measured.