Loading…
Loading…
3,639 results • Best match
MAJOR REPAIR WORKS AT GUPS KALAROHI BLOCK- GIRWA DISTRICT- UDAIPUR
Grading roof for water proofing treatment with water proffing compoundCement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
MAJOR REPAIR WORKS AT GUPS KEMARI BLOCK- GIRWA DISTRICT- UDAIPUR
Grading roof for water proofing treatment with water proffing compoundCement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
AS PER BOQ AND TENDER DOCUMENT
M&L for Chipping of slab/columns/beams/chajjas/ parapet and removing loose mortar with chisel hammer without much impact concrete and cleaning the exposed reinforcement with wire brush and sand blasting the surface using river sand with minimum of 6 Kg pressure at the nozzle end by mechnical compressor and proiding zinc rich primer at the rate of 5 Sqm/Ltr with Shaliprime zn R to reinforcement as per manufacturers instructions and including all scaffolding, machinery, tools tackles and men, materials and clearing of debries complete all as specified and directed by Engr-in-Charge. Make : Shaliprime zn R of STP or equivalent brand in Fosroc/Dr. Fixit.
nstallation of 17 Nos New DT (03 Nos. 25 KVA), (08 Nos. 63KVA), (01 Nos. 100KVA) AND (05 Nos. 250KVA) Work at different places in the work area of (Assistant Engineer 11KV AND LT BKT) of 33/11 KV Substation, SADAMAU AND KUMBHRAWA
Grouting of PCC/STP in depth of 1/6th the length of pole in ratio 1:4:8 in cement sand and brick ballast and construction of pole plinth 300mm x 45mm above ground level in 1:2:4 in cement, coarse sand and stone gritt as per RESSPO norms.
38/EDC(G)/2026-27
LT clamp with nuts and bolt of PCC/STP
Annual maintenance of pump and motor of the borewells in ward No 01 to 23 and in the water reservoir in Chikkanayakanahalli Town
Water Treatment Plants HORIZANTAL PUMP ALL TYPES-For Pump open & refitting after repairs 25 HP to 100 HP