Loading…
Loading…
3,639 results • Best match
WORK OF DEVELOPMENT OF GARDEN NEAR SHANKAR BHUVAN ON EAST BANK, INCLUDING CIVIL, PLUMBING, ELECTRICAL & ELV WORKS, DEVELOPMENT OF RESIDUAL SPACE ELEMENTS ON BOTH EAST AND WEST BANK AND CONSTRUCTION OF WALL CLIMBING FACILITY NEAR SARDAR BRIDGE ON WEST BANK FOR SABARMATI RIVERFRONT DEVELOPMENT CORPORATION LIMITED
like basement rafts, retaining walls, sewage & water treatment plant, tunnels/subway, etc. at the
Installation of Additional 5 MVA Old and Used Transformer at Substation Sadhamau BKT from 2 No 10 MVA to 2 No 10 and 1 No 5 MVA as per Stock Issue Rate 2025 26 Under Business Plan 2026 27
Fabrication & erection of 33 KV cable exposure type double pole with the provision of separate bus bar for each cable with fixing of necessary clamps and other acessories like danger board,number plate,barbed wire, 6 no. pin insulators with pins,2 no. channels 100x50 mm (1600mm each),1 no.MS channel 100x50 mm(3200mm in length) and 2 no.MS angle 65x65x6 mm (each 3200mm in length ) for supporting the hoisting of cable etc.Its jumpering by single core PVC aluminium cable with proper size of lug as per RESSPO norms.(All material to be arranged by contractor except STP, MS Channel, MS Angle, 33 KV Pin Insulator, 33 KV Pin with nut &PVC cable).
SPECIAL REPAIR TO PARKING HANGER OF RPA FLT BLDG NO P 106 UNDER GE MISSAMARI
Floor Leveling (3mm thick) : Providing and applying 2 part water dispersed epoxy resin primer sikafloor (R)-80 epocem primer or equivalent make like Fosroc/BASF/STP etc. Followed by applying temporary moitsturer barrier technology based three part self smoothing underlay screed sikafloor 8.1 epocem or equivalent make like Fosroc/BASF/STP etc to a thickness of 2mm having carbon dioxide diffusion coefficient 1782 as per Klopfer Engel fried method, water absorption co-efficient uH20 + 177 as per DIN 52615, Water absorption co-efficient W = 0.06kg/m2as per SN EN 1062-3, Compressive strength 55 N/Sqmm after 28 days as per ASTM C 579, Flexural strength 10 N/Sqmm after 28 days as per EN 196, when applied at minimum 3 mm thickness it can be laid over high moisture content substate when substrate moisture is more than 4%
Repair and maintenance of facade work in (G plus 7 Storeyed) Residence Buildings
Providing and applying crystalline mortar by mixing in the ratio of 4.5 : 1 (4.5 parts crystalline mortar : 1 part water) for the treatment of faulty construction joints, cracks, tie rod holes and spalled & honeycombed surface of RCC underground structures like basement, water tanks, bridge deck etc. to ensure water tightness. The crystallie mortar shall conform to the EN 1504- 3 having compressive strength Class R4 ≥45 MPa and adhesive bond strength Class R3 ≥1.5 MPa. The work shall be carried out all complete as per specification and the direction of the engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage.
SPECIAL REPAIR TO BLDG NO T-106 AND T-107 ALONGWITH SPECIAL REPAIR TO BLDG NO P-152 AT FD HOSP AREA UNDER GE 871 EWS
Water proof treatment on roof top with APP (Ataxic Poly Propylene) modified polymeric five layered membrane with central core of 100 micron high molecular high density polyethylene film, minimum weight not less than 3.0 Kg/ Sqm, not less than 3.0mm thick, centre core is sandwiched on both sides by high quality polymeric mix with properties of high softening point, high heat resistance and cold resistivity to make it ideal for all water proofing treatment, with polymeric mix protection on both sides with 20 micron HMHDPE film, laid over one coat of bituminous primer conforming to IS: 3384, applied @0.40 Kg/ Sqm and one coat of hot blown bitumen of 85/25 grade, conforming to IS:702, applied @1.20Kg/ Sqm on prepared surfaces of roof, overlap should be not less than 150mm at ends and 75mm at sides, joints and overlaps uniformly bounded with LPG torch flame including applying of one coat of semi hot blown bitumen of 85/25 grade, @1.20 Kg Sqm and fine screened sand in dry condition @0.50 Kg/ Sqm after laying the membrane, complete all as specified and as directed. Note: Water proofing treatment shall be done on prepared plaster surfaces of roof top.
EWSCA-12/2026-27
11 Meter long STP (SP-55)