Loading…
Loading…
3,727 results • Best match
COMPOSITE WORKS INSIDE REFINERY FOR POLYPROPYLENE PROJECT-KOCHI REFINERY OF M/S BHARAT PETROLEUM CORPORATION LIMITED (BPCL)
Providing and mixing integral crystalline admixture for water proofing treatment to RCC structures like basement raft, retaining walls, reservior, sewage & water treatment plant, tunnels / subway and bridge deck etc. at the time of transporting of concrete into the drum of the ready-mix truck, using integral crystalline admixture @ 0.80% (minimum) to the weight of cement content per cubic meter of concrete) or higher as recommended by the manufacturer’s specification in reinforced cement concrete at site of work. The material shall meet the requirements as specified in ACI-212-3R- 2010 i.e. by reducing permeability of concrete by more than 90%, compared with control concrete as per DIN 1048 and resistant to 16 bar hydrostatic pressure. The crystalline admixture shall be capable of self-healing of cracks up to a width of 0.50mm. The work shall be carried out all complete as per specification and the direction of the Engineer-in-charge. The product performance shall carry guarantee for 10 years against any leakage.
PERIODICAL SERVICES, SMART PERIODICAL AND CERTAIN B/R WORKS FOR CERTAIN BLDGS IN CAMP AREA UNDER GE (AF) PALAM, DELHI CANTT-10
M&L for special treatment for sunken portion of WCs/Bath & toilet etc executed in following stages:- Stage 1: Providing 15mm thick plaster in CM (1:3) mixed with water proofing chemical of Dr.Fixit or Shalicrete 'R' of STP Ltd in the proportion/quantity all as per manufacturer's instructions. State 2 : Primer-Mix Tarfelt LM of STP Ltd (diluted with water in ratio 1:1) @ 250 gms/sqm and apply the primer on the plastered surfaces. Stage 3 : Application of 1st coat of Tarfelt LM of STP Ltd (without dilution with water) @ 1Kg/Sqm by brush all as per manufactuer's instructions. Stage 4: Laying fyber glass cloth (weight not less than 50gram/ Sqm) over the 1st coat while the coated surface is still sticky. Stage 5: After 6 to 7 hours interval, apply second coat i.e. final coat of Tarfet LM of STP Ltd (without Dilution with water) @ 1kg/ Sqm by brush as per manufacturer's instructions. Stage 6: Providing 10mm thick protective plaster in CM 1:3 mixed with STP No. 1 @ 250ml/50 Kg cement all as per manufacturer's instructions. Stage 7: Carryout ponding test for 48 hours to ensure water tightness of repaired sunken portion. NOTES :- (i) Mode of measurement shall be actual area treated (floor and adjoining walls).
SPECIAL REPAIR OF CERTAIN PORTION OF MHOW FORT BLDG UNDER GE MIS MHOW
M & L PCC 1:2:4 type B-0 (using 12.5 mm graded crushed stone aggregate) mixed with integral waterproofing chemical PIDIPROOF LW of DR FIXIT of PIDILTE INDUSTRIES LTD or STP No. 1 (LIQUID) of STP LTD @ 200 millilitre per 50 Kg per cement, as in padding on roof surface for correcting / making proper slope on roof, and finishing the surfaces fair and even without using extra cement complete all as specified and directed. Note:- Liquid WPC shall be measured and paid separately.
Construction of offices of SSE(Works)-Palanpur and SSE(P.way)-Palanpur under jurisdiction of Divisional Engineer (North)-ADI. (Composite Tender) (Re-invite)
@ 0.242 kg/sqm mixed with water proofing cement compound @ 0.126 kg/sqm. This layer will be allowed to air cure for 4 hours followed with water curing for 48 hours. The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipes and masonry with polymer mixed slurry. Grading roof for water proofing treatment 22.14 with 22.14.1 Cement concrete 1:2:4 (1 cement : 2 coarse cum 1320 8042.3 10615836 102 sand : 4 graded stone aggregate 20 mm nominal size) 26.0 NEW TECHNOLOGIES AND MATERIALS 26.41S NEW TECHNOLOGY ITEMS Providing and laying factory made Precast concrete solid blocks of 200 mm thickness of 26.68 grade M10 made of C&D waste from approved manufacturer in foundation and plinth in: 26.68.1 Cement mortar 1:6 (1 cement : 6 coarse cum 734.09 7387.25 5422906.35 103 sand) Providing and laying factory made Precast concrete solid blocks of 200 mm thickness of 26.69 grade M10 made of C&D waste from approved manufacturer in superstructure above plinth level up to floor V level 26.69.1 Cement mortar 1:6 (1 cement : 6 coarse cum 76.8 9844.65 756069.12 104 sand) 26.72 Providing and laying 60mm thick factory Sqm 1000 829.75 829750 made cement concrete paver block of approved shape and colour of M -30 grade made of C&D waste by block making 105 machine with vibratory compaction laid in required pattern and including over 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. Total 63365569.74
REPAIR TO TILING, ROOF TREATMENT, JOINERY SUNKEN ETC. AT OFFR MD ACCN UNDER GE (MCTE) MHOW
Supply & providing water proofing roof treatment with polymeric standard water proofing membrane, having 10 years gurantee for water tightness complete all as specified and described as under:- (a) Preparation of RCC roof surface and applying one coat of polymeric modified bitumen 85/25 @ 1.2Kg/Sqm over a coat of polymeric primer @ 0.30 Kg/sqm including cleaning surface all as per manufaturer's specification complete all as specified and directed. (b) Supply & providing water proofing with 3mm thick APP polymeric proofing membran of 3Kg/Sqm consisting of 100micron HMHDPE film centre core including coating the surface with compatible primer and torch application of membrane with 10cm overlaps as required thereof, complete all as specified and directed. (c) Aluminium bituminous paint @1.10 Kg/Sqm shall be applied over the APP membrane surface. Note:- The work of water proofing treatment shall be got executed through expert team of manufacturers or authorised applicator of manufacturer.
Provision of Railnet facility at Barhni,Balrampur stations for SSE/Works & SSE/P Way offices in the LJN Division.
Supply of STP (Shielded twisted pair) CAT-6 Cable as per EIA/TIA-568-B Specification or latest. As per item no 2 of technical specification attached. Inspection- Consignee Above/