Loading…
Loading…
3,523 results • Best match
SITC of Motor Set in 3 STP of NITC
SITC of Three Phase 5HP Monoblock pump set capable of delivering 600-800 lpm at a head range of 28-44 mtrs at rated rpm above 2800 rpm. The dimension of motor shall be 65x 50 mm .Class A type .The existing motor shall be replaced from the installed site and shall be shifted to the store and duly connecting the new motor pump & establish the needful for normal working complete .(Model-Lubi LBH 46 HB/ Kirloskar/ Crompton or equivalent make & modelwhich is ISO certified with minimum of 1 year warranty from OEM)(NOTE:-All tools & Plants required for removal of old pump and fixing of new pump will be supplied by Agency and nothing will be paid extra for the same)
Provding and fixing jack screw SGT-150 From STP
Provding and fixing jack screw SGT-150 From STP
Improvement works to 4.08 MLD STP at Sathyamangalam Municipality
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum
Construction of 400 KLD STP in 432 EWS buildings under Pradhan Mantri Awas Yojana and 5 Years Operation and Maintenance Work In Dasna Ghaziabad.
SEWAGE TREATMENT PLANT: Design, Supplying, Installing, Testing & Commissioning of Sewage Treatment Plant capacity 400 m3/day Nature of effluent Domestic Sewage from Toilet use and kitchen waste Daily average flow-400 Cum/Day pH-7.5-8.5 BOD5-upto 300-350 Mg/L S. Solids-200-250 Mg/L COD-upto 400-500 Mg/L Oil & Grease-30 Mg/L Effluent discharge standard after treatment pH-6.0-8 BOD5-Less than 10 Mg/L S. Solids - Less than 20 Mg/L COD-Less than 50 Mg/L Oil & Grease - Less than 5mg/1 Sewage Treatment Plant shall comprise of following tanks in civil: Bar Screen Chamber - 1 No Oil & Grease Trap Chamber 1 No Equalization Tank - 1 No Irrigation Water Tank - 1 No Flushing Water Tank - 1 No Plant Room-1 No Shop Drawings Detailed GA drawing, flow diagram, equipment list, power load requirement with design calculations of all Tanks, elements of the plant, electrical and mechanical work to satisfy / supply adequacy of design followed by submission of detailed GOOD FOR CONSTRUCTION' architectural, electrical, mechanical and piping drawing for approval. Contractor shall ensure submission of detailed GA drawings (Plan & Section), P & I diagram, schematic diagram for the above mentioned components and additional components such as inserts, puddle flanges, vent pipes etc. if so required for the complete work
REPAIR AND MAINTENANCE OF STPs FILTER MEDIA SEWAGE PUMPS AIR BLOWERS CONNECTED PIPELINE NETWORK ALONGWITH MISC ITEMS OF STPs AND RAPAIR MAINTENANCE DEVELOPMENT OF RECHARGE OF RAIN WATER HARVESTING AND IN THE AOR OF AGE U WATER SUPPLY NO I UNDER GE U
M&L Cleaning of following Capacity STP sewage and Removing of Settle down Sewage Sludge cum mud of Bar Screen Chamber pit, Oil & Grease trap tank, unit chamber, equalisation tank, MBBR-1, MBBR-2 Tank, SBT Tank,Tube Settler tank, Filter feed tank, Treated water tank. including cleaning of choked MS pipes, SS riser pipes, air diffusers in equalisation tank,tube settler and MBBR tanks and refixing the same on quarterly basis and ensuring proper running of whole plant to the entire satisfaction of Engr-in-Charge. Note : (a) Cleaning Inner surface of tank complete by scraping with steel wire brush and removing mud and sludge collected inside the tank manually and deposit where directed. (b) Washing with clean water and bleaching powder complete tank internally and Removal of left out sludge if any at site and deposit where directed.
CONSTRUCTION OPERATION AND MAINTENANCE OF STP FOR RANI TALAB IN CHAKRADHARPUR NAGAR PARISHAD DISTRICT WEST SINGHBHUM
SEWAGE TREATMENT PLANT