Loading…
Loading…
3,430 results • Best match
investigation survey construction of 1000 kld stp and 300,300 kld co treatmentplant in Np Allhaganj Dist Shahjhanpu
Survey, Investigation, Design, Installation, Testing, Cmmissioning, Supply and Construction of Nature Based STP of following capacity with Coarse Screen Chamber with Grit Chamber Before STP on any proven technology including Preliminary Treatment of waste water / raw water, secondary treatment , tertiary treatment ( if required to achieve treated effluent parameters as per NGT Norms ), lifting up of waste water/ raw water with pumps, sludge handling , outfall sewer, treated water pumping if required to dispose into river , required buildings , earth filling , site development, boundry wall , electric connection in STP if required for complete campus and allied works in an odour free environment as per scope of bid document with one year of defects liability period for civil works and two year DLP for e/m works that shall include but not limited to getting NOC from different departments , vetting of design drawing from IIT/any govt. technical reputed institute, third party testing of influent, treated effluent, sludge and other related works. Note- IN case of technology provider , technology provider must have register office in india.
Job required for Manning and Operation of DK I STP and Arjan Vihar STP in the of AGE (U) Water Supply No II under GE (U) Water Supply Delhi Cantt-10
Work of anti-corrosive and efficiency improvement coating of CCW pumps of unit 1 to 6, STPS, Suratgarh
Construction of pedestals, strengthening of steel structure and structure painting for ash disposal pipeline at STPS Plant, Suratgarh
General civil repair and maintenance work of Central School building under Sector 3 to 7 at STPS, Sarni
To, The SE (P&W) STPS, M.P. Power Generating Company,Sarni DIstt Betul (MP)
Construction of 200 MLD MPS, 100 MLD STP along with Bio-CNG Plant and OandM for 10 years after completion of 1 year Defect Liability Period at, Dhanwapur, Gurugram
Design, Construction, Supply, Erection, Testing, Commissioning of 100 MLD capacity Main Pumping Station (MPS) and 100 MLD Sewage Treatment Plant (STP) based on Sequential Batch Reactor (SBR) Technology alongwith Bio - CBG Plant comprises of Main Receiving Chamber, By Pass Channel, Inlet Chamber, Coarse Screen Chamber, Distribution Chamber, Wet Sump, Piping Gallery, Stilling Chamber, Fine Screen Chamber, Sump, Grit Chamber, Distribution Channel, Distribution Chamber, Valve Chamber, Primary Clarifier, Distribution Chamber, SBR Basin, Equivalization Tank, Receiving Chamber, Treated water channel, Chlorine Contact Tank, Combined Sludge Sump, Thickened Sludge Sump, Sludge Thickener, Anaerobic Sludge Digestor, Digested Sludge Sump, Gas Holding Tank and Compressed Bio Gas Tanks on turnkey basis complete in all respect along with 11 Years Defect Liability –cum – Maintenance Period (including 3 Years Defect Liability Period after 3 months trial run). (OandM Cost will be considered as 49% of the quoted price for this item). 1.1. Complete Civil Works